{"id":100158,"date":"2025-09-02T12:00:00","date_gmt":"2025-09-02T12:00:00","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=100158"},"modified":"2025-09-02T13:16:00","modified_gmt":"2025-09-02T13:16:00","slug":"realizan-mantenimiento-en-lineas-de-transmision-de-monagas-para-elevar-capacidad-del-servicio","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=100158","title":{"rendered":"Realizan mantenimiento en l\u00edneas de transmisi\u00f3n de Monagas para elevar capacidad del servicio"},"content":{"rendered":"\n<p><strong>Estado Monagas.-<\/strong> Con el prop\u00f3sito de elevar la capacidad del servicio el\u00e9ctrico en el estado Monagas, el equipo t\u00e9cnico de la <a href=\"https:\/\/www.instagram.com\/corpoelecinfo\/\" data-type=\"link\" data-id=\"https:\/\/www.instagram.com\/corpoelecinfo\/\">Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC)<\/a> ejecut\u00f3 mantenimiento a las torres asociadas a la l\u00ednea de transmisi\u00f3n Jusep\u00edn-Cerro Azul a 115kV.<\/p>\n\n\n\n<p>Entre las labores ejecutadas se encuentran la reposici\u00f3n de perfiles y la soldadura de equipos estrat\u00e9gicos, necesarios para los procesos de transmisi\u00f3n.<\/p>\n\n\n\n<p>La rehabilitaci\u00f3n de la infraestructura el\u00e9ctrica se realiza para proteger el Sistema El\u00e9ctrico Nacional (SEN) y contribuir a la estabilidad del servicio en el oriente venezolano.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica. a trav\u00e9s de CORPOELEC, contin\u00faan concentrando esfuerzos en la mejora progresiva del SEN con el objetivo de ofrecer un servicio el\u00e9ctrico continuo, confiable y eficiente a los venezolanos.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Monagas.- Con el prop\u00f3sito de elevar la capacidad del servicio el\u00e9ctrico en el estado Monagas, el equipo t\u00e9cnico de<\/p>\n","protected":false},"author":24,"featured_media":100181,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[3287,2691,3286,2703,2798],"class_list":["post-100158","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-cerro-azul","tag-corpoelec","tag-jusepin","tag-monagas","tag-transmision"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100158"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100158\/revisions"}],"predecessor-version":[{"id":100167,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100158\/revisions\/100167"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/100181"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}