{"id":100191,"date":"2025-09-03T06:00:00","date_gmt":"2025-09-03T06:00:00","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=100191"},"modified":"2025-09-03T01:04:37","modified_gmt":"2025-09-03T01:04:37","slug":"instalacion-de-transformadores-optimiza-servicio-electrico-en-valles-del-tuy","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=100191","title":{"rendered":"Instalaci\u00f3n de transformadores optimiza servicio el\u00e9ctrico en Valles del Tuy"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> En un esfuerzo por optimizar los servicios p\u00fablicos en materia de energ\u00eda, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), instal\u00f3 cuatro transformadores en beneficio de 30 mil 776 usuarios de los municipios Independencia y Sim\u00f3n Bol\u00edvar del eje Valles del Tuy, estado Miranda.<\/p>\n\n\n\n<p>La puesta en servicio de estos equipos, con capacidad de 50 kVA, garantiza la operatividad del suministro el\u00e9ctrico en los sectores: Dos Lagunas, Para\u00edso del Tuy, La Pica y el urbanismo Independencia.<\/p>\n\n\n\n<p>Asimismo, la cuadrilla del centro de servicio Santa Teresa solvent\u00f3 21 restricciones operativas que consistieron en el cambio de componentes el\u00e9ctricos como: pararrayos, aisladores, fusibles y torniller\u00eda, con el prop\u00f3sito de optimizar el servicio el\u00e9ctrico.<\/p>\n\n\n\n<p>Estas acciones forman parte de las solicitudes realizadas por los usuarios a trav\u00e9s de la L\u00ednea VenApp, herramienta que facilita la atenci\u00f3n oportuna en el territorio nacional y reafirma el compromiso del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y CORPOELEC con el pueblo mirandino.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- En un esfuerzo por optimizar los servicios p\u00fablicos en materia de energ\u00eda, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), instal\u00f3<\/p>\n","protected":false},"author":24,"featured_media":100082,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,11,2744,46],"class_list":["post-100191","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100191"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100191\/revisions"}],"predecessor-version":[{"id":100193,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100191\/revisions\/100193"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/100082"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}