{"id":100248,"date":"2025-09-04T15:31:33","date_gmt":"2025-09-04T15:31:33","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=100248"},"modified":"2025-09-04T15:31:34","modified_gmt":"2025-09-04T15:31:34","slug":"corpoelec-fortalece-el-sistema-electrico-entre-guarico-y-bolivar","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=100248","title":{"rendered":"CORPOELEC fortalece el sistema el\u00e9ctrico entre Gu\u00e1rico y Bol\u00edvar"},"content":{"rendered":"\n<p><strong>Estado Gu\u00e1rico.\u2013 <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 mantenimiento correctivo y preventivo a la subestaci\u00f3n San Ger\u00f3nimo B, para optimizar la operatividad de la infraestructura y garantizar el suministro de energ\u00eda a 850 mil habitantes de los estados Gu\u00e1rico y Bol\u00edvar.<\/p>\n\n\n\n<p>Las maniobras contemplaron la adecuaci\u00f3n de un seccionador, ajustes, lubricaci\u00f3n e inspecci\u00f3n de equipos de potencia asociados a estas instalaciones.<\/p>\n\n\n\n<p>Estas labores tambi\u00e9n aseguran el rendimiento de la l\u00ednea 765 kV Malena\u2013San Ger\u00f3nimo I, reforzando la confiabilidad del sistema en el eje centro\u2013sur del pa\u00eds.<\/p>\n\n\n\n<p>De esta manera, el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de CORPOELEC, impulsa acciones eficientes que tributan a la estabilizaci\u00f3n del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Gu\u00e1rico.\u2013 La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 mantenimiento correctivo y preventivo a la subestaci\u00f3n San Ger\u00f3nimo B, para optimizar<\/p>\n","protected":false},"author":22,"featured_media":100249,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2723,2691,2729,11,2744,46],"class_list":["post-100248","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-bolivar","tag-corpoelec","tag-guarico","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100248"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100248\/revisions"}],"predecessor-version":[{"id":100250,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100248\/revisions\/100250"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/100249"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}