{"id":100411,"date":"2025-09-11T15:08:07","date_gmt":"2025-09-11T15:08:07","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=100411"},"modified":"2025-09-11T15:11:05","modified_gmt":"2025-09-11T15:11:05","slug":"mejoras-al-servicio-electrico-favorecen-a-mas-de-80-mil-usuarios-del-eje-tuy","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=100411","title":{"rendered":"Mejoras al servicio el\u00e9ctrico favorecen a m\u00e1s de 80 mil usuarios del eje Tuy"},"content":{"rendered":"\n<p><strong>Estado Miranda.\u2013 <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 mejoras en los circuitos Frigor\u00edfico, Pintuy, Ave Mar\u00eda, Haier, SVECA, Balgres, Tocor\u00f3n, Valle Verde, Ocumare, Colonia Mendoza, Rangel, UNITECA y Pe\u00f1\u00f3n, ubicados en los Paz Castillo, Sim\u00f3n Bol\u00edvar y Tom\u00e1s Lander, beneficiando directamente a m\u00e1s de 80.000 usuarios del estado Miranda.<\/p>\n\n\n\n<p>El despliegue abord\u00f3 sectores de las parroquias Cartanal, San Francisco de Yare, Ocumare del Tuy, Colonia Mendoza y La Democracia, donde se realizaron adecuaciones a las redes de distribuci\u00f3n mediante ajuste de piezas, sustituci\u00f3n de fusibles y componentes, as\u00ed como la elaboraci\u00f3n de empalmes lineales para garantizar la continuidad del servicio el\u00e9ctrico.<\/p>\n\n\n\n<p>Durante las labores tambi\u00e9n se efectu\u00f3 el despeje de vegetaci\u00f3n cercana a los corredores de servicio de las l\u00edneas de distribuci\u00f3n, adem\u00e1s de la sustituci\u00f3n de equipos en los patios de la subestaci\u00f3n Yare, ubicada en el municipio Sim\u00f3n Bol\u00edvar.<\/p>\n\n\n\n<p>Con estas acciones, CORPOELEC avanza en el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN), elevando los est\u00e1ndares de eficiencia y confiabilidad para el buen vivir del pueblo mirandino.<\/p>\n\n\n\n<p><strong>Prensa MPPEE \u2013 CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.\u2013 La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 mejoras en los circuitos Frigor\u00edfico, Pintuy, Ave Mar\u00eda, Haier, SVECA, Balgres, Tocor\u00f3n,<\/p>\n","protected":false},"author":24,"featured_media":100415,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,2831,3265,3262],"class_list":["post-100411","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-paz-castillo","tag-simon-bolivar","tag-tomas-lander"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100411","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100411"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100411\/revisions"}],"predecessor-version":[{"id":100413,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100411\/revisions\/100413"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/100415"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100411"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100411"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100411"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}