{"id":100509,"date":"2025-09-15T14:22:47","date_gmt":"2025-09-15T14:22:47","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=100509"},"modified":"2025-09-15T14:22:48","modified_gmt":"2025-09-15T14:22:48","slug":"corpoelec-optimiza-operatividad-de-la-subestacion-ejido-en-merida","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=100509","title":{"rendered":"CORPOELEC optimiza operatividad de la subestaci\u00f3n Ejido en M\u00e9rida"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.\u2013<\/strong> A trav\u00e9s del Plan Nacional de Mantenimiento Integral de Subestaciones y Circuitos El\u00e9ctricos, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) despleg\u00f3 maniobras de revisi\u00f3n y sustituci\u00f3n de equipos en la subestaci\u00f3n Ejido, beneficiando directamente a usuarios de los municipios Sucre, Campo El\u00edas y Libertador del estado M\u00e9rida.<\/p>\n\n\n\n<p>Esta intervenci\u00f3n t\u00e9cnica permiti\u00f3 optimizar la operatividad de los circuitos Cinco \u00c1guilas, Villa Libertad y Lagunillas, ubicados en el eje metropolitano, donde se realizaron labores de correcci\u00f3n de puntos calientes, ajustes de componentes y verificaci\u00f3n de condiciones operativas, con el prop\u00f3sito de mejorar la estabilidad del suministro el\u00e9ctrico.<\/p>\n\n\n\n<p>De manera permanente, las cuadrillas operativas se mantienen desplegadas en las instalaciones el\u00e9ctricas de la entidad para cumplir con mantenimientos preventivos y correctivos que tributen al \u00f3ptimo funcionamiento del Sistema El\u00e9ctrico Nacional (SEN), en cumplimiento de los lineamientos del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.\u2013 A trav\u00e9s del Plan Nacional de Mantenimiento Integral de Subestaciones y Circuitos El\u00e9ctricos, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC)<\/p>\n","protected":false},"author":24,"featured_media":100510,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2824,2691,3132,2742,3057],"class_list":["post-100509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-circuitos","tag-corpoelec","tag-ejido","tag-merida","tag-subestaciones"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100509"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100509\/revisions"}],"predecessor-version":[{"id":100511,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100509\/revisions\/100511"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/100510"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}