{"id":100572,"date":"2025-09-17T18:46:32","date_gmt":"2025-09-17T18:46:32","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=100572"},"modified":"2025-09-17T18:46:35","modified_gmt":"2025-09-17T18:46:35","slug":"adecuaciones-en-redes-electricas-benefician-a-mas-de-15-mil-familias-paraguaneras","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=100572","title":{"rendered":"Adecuaciones en redes el\u00e9ctricas benefician a m\u00e1s de 15 mil familias paraguaneras"},"content":{"rendered":"\n<p><strong>Estado Falc\u00f3n.\u2013<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) llev\u00f3 a cabo un despliegue integral de mantenimiento en redes y circuitos el\u00e9ctricos de las parroquias Ad\u00edcora y Pueblo Nuevo, ubicadas en el municipio Falc\u00f3n, beneficiando directamente a m\u00e1s de 15.000 familias de la entidad centroccidental. <\/p>\n\n\n\n<p>Durante las acciones, se realiz\u00f3 el lavado de 10 kil\u00f3metros de l\u00edneas en 13,8 kV del circuito Ad\u00edcora, perteneciente a la subestaci\u00f3n Pueblo Nuevo 115 kV. Adem\u00e1s, se ejecut\u00f3 la instalaci\u00f3n de transformadores de 37,5 kVA, junto al cambio de herrajes, crucetas, postes y aisladores en la zona de El V\u00ednculo.<\/p>\n\n\n\n<p>Asimismo, se efectuaron labores de mantenimiento y control de vegetaci\u00f3n en m\u00e1s de 55 kil\u00f3metros de redes el\u00e9ctricas entre las poblaciones de Ad\u00edcora y Pueblo Nuevo, con el objetivo de prevenir interferencias y garantizar la continuidad del servicio.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de CORPOELEC, articula estrategias orientadas a robustecer el Sistema El\u00e9ctrico Nacional (SEN) con el objetivo de garantizar el bienestar del pueblo venezolano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Falc\u00f3n.\u2013 La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) llev\u00f3 a cabo un despliegue integral de mantenimiento en redes y circuitos el\u00e9ctricos<\/p>\n","protected":false},"author":24,"featured_media":100573,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[3323,2691,2695,2875],"class_list":["post-100572","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-adicora","tag-corpoelec","tag-falcon","tag-pueblo-nuevo"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100572"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100572\/revisions"}],"predecessor-version":[{"id":100574,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100572\/revisions\/100574"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/100573"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100572"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100572"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}