{"id":100810,"date":"2025-09-24T17:15:02","date_gmt":"2025-09-24T17:15:02","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=100810"},"modified":"2025-09-24T17:15:06","modified_gmt":"2025-09-24T17:15:06","slug":"mas-de-1-400-familias-cojedenas-favorecidas-con-mantenimiento-a-subestacion-san-carlos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=100810","title":{"rendered":"M\u00e1s de 1.400 familias cojede\u00f1as favorecidas con mantenimiento a subestaci\u00f3n San Carlos"},"content":{"rendered":"\n<p><strong>Estado Cojedes.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 labores de mantenimiento preventivo y correctivo en la subestaci\u00f3n San Carlos, con el prop\u00f3sito de garantizar un servicio estable para m\u00e1s de 1.400 familias del estado Cojedes.<\/p>\n\n\n\n<p>Las maniobras contemplaron mantenimiento preventivo, ajustes de torniller\u00eda, lubricaci\u00f3n de los elementos m\u00f3viles y limpieza de equipos estrat\u00e9gicos, acciones que optimizan el fluido el\u00e9ctrico en m\u00e1s de 60 comunidades de los municipios Ezequiel Zamora y Tinaco.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de CORPOELEC, enfoca sus esfuerzos en la atenci\u00f3n directa de las necesidades de las comunidades, mediante un suministro el\u00e9ctrico seguro y confiable.<\/p>\n\n\n\n<p><strong>Prensa MPPEE \u2013 CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Cojedes.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 labores de mantenimiento preventivo y correctivo en la subestaci\u00f3n San Carlos, con<\/p>\n","protected":false},"author":24,"featured_media":100811,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2710,2691,3303],"class_list":["post-100810","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-cojedes","tag-corpoelec","tag-san-carlos"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100810"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100810\/revisions"}],"predecessor-version":[{"id":100812,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100810\/revisions\/100812"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/100811"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100810"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100810"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}