{"id":100829,"date":"2025-09-25T14:32:01","date_gmt":"2025-09-25T14:32:01","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=100829"},"modified":"2025-09-25T14:49:40","modified_gmt":"2025-09-25T14:49:40","slug":"mas-de-4-mil-metros-despejados-a-traves-de-control-de-vegetacion-en-merida","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=100829","title":{"rendered":"Ejecutan control de vegetaci\u00f3n en m\u00e1s de 4 mil metros de l\u00edneas de distribuci\u00f3n en M\u00e9rida"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.-<\/strong> Las cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecutaron jornadas de mantenimiento preventivo en m\u00e1s de 4 mil metros de l\u00edneas de distribuci\u00f3n del sistema el\u00e9ctrico del estado M\u00e9rida, como parte del <a href=\"http:\/\/mppee.gob.ve\/?p=99708\" data-type=\"link\" data-id=\"http:\/\/mppee.gob.ve\/?p=99708\">Plan Nacional de Control de Vegetaci\u00f3n<\/a>.<\/p>\n\n\n\n<p>Las labores se enfocaron en el mantenimiento de l\u00edneas de transmisi\u00f3n y redes de distribuci\u00f3n, fortaleciendo la operatividad del sistema el\u00e9ctrico y reduciendo significativamente el riesgo de interrupciones por presencia de vegetaci\u00f3n, especialmente en temporada de lluvias.<\/p>\n\n\n\n<p>Durante los \u00faltimos d\u00edas, el Plan Nacional de Control permiti\u00f3 atender diez casos mediante la L\u00ednea VenApp, logrando una cobertura integral en los cinco ejes territoriales de M\u00e9rida.<\/p>\n\n\n\n<p>Con estas acciones, CORPOELEC fortalece su v\u00ednculo con las comunidades meride\u00f1as, garantizando una infraestructura el\u00e9ctrica confiable y segura.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.- Las cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecutaron jornadas de mantenimiento preventivo en m\u00e1s de 4 mil<\/p>\n","protected":false},"author":24,"featured_media":100830,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[3281,2691,2742],"class_list":["post-100829","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-control-de-vegetacion-2","tag-corpoelec","tag-merida"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100829","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100829"}],"version-history":[{"count":3,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100829\/revisions"}],"predecessor-version":[{"id":100840,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/100829\/revisions\/100840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/100830"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}