{"id":101082,"date":"2025-10-02T13:47:47","date_gmt":"2025-10-02T13:47:47","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101082"},"modified":"2025-10-02T13:47:48","modified_gmt":"2025-10-02T13:47:48","slug":"tres-comunidades-de-atures-fortalecen-su-sistema-electrico-con-nuevos-equipos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101082","title":{"rendered":"Tres comunidades de Atures fortalecen su sistema el\u00e9ctrico con nuevos equipos"},"content":{"rendered":"\n<p><strong>Estado Amazonas.- <\/strong>En un esfuerzo por optimizar y garantizar la calidad del servicio, trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instalaron transformadores en tres comunidades del municipio Atures, beneficiando a m\u00e1s de 100 familias de la entidad amazonense.<\/p>\n\n\n\n<p>Las maniobras se llevaron a cabo en respuesta a los requerimientos generados a trav\u00e9s de la L\u00ednea VenApp del Sistema 1&#215;10 del Buen Gobierno, una plataforma clave para enlazar las necesidades del Poder Popular con la acci\u00f3n institucional.<\/p>\n\n\n\n<p>Los nuevos equipos, con capacidades de 37.5 kVA y 25 kVA, fueron puestos en servicio en las comunidades Altos de San Antonio (circuito Platanillal), y Puerto Lucera y Monte Blanco (circuito Pavoni).<\/p>\n\n\n\n<p>Ana Rodr\u00edguez, habitante de la comunidad Altos de San Antonio, expres\u00f3 que el abordaje t\u00e9cnico les permite \u00abcontar con un suministro el\u00e9ctrico m\u00e1s seguro y eficiente\u00bb.<\/p>\n\n\n\n<p>Con estas acciones, CORPOELEC ratifica su compromiso de seguir brindando soluciones efectivas y mejoras continuas en la prestaci\u00f3n del servicio el\u00e9ctrico para toda la poblaci\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE \u2013 CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Amazonas.- En un esfuerzo por optimizar y garantizar la calidad del servicio, trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC)<\/p>\n","protected":false},"author":24,"featured_media":101083,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2740,2911,2691,2751],"class_list":["post-101082","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-amazonas","tag-atures","tag-corpoelec","tag-transformadores"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101082","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101082"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101082\/revisions"}],"predecessor-version":[{"id":101084,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101082\/revisions\/101084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101083"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}