{"id":101116,"date":"2025-10-03T16:23:06","date_gmt":"2025-10-03T16:23:06","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101116"},"modified":"2025-10-03T16:23:08","modified_gmt":"2025-10-03T16:23:08","slug":"fortalecen-distribucion-con-instalacion-de-transformadores-en-nueve-municipios-de-merida","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101116","title":{"rendered":"Fortalecen distribuci\u00f3n con instalaci\u00f3n de transformadores en nueve municipios de M\u00e9rida"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.-<\/strong> Durante el mes de septiembre, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instal\u00f3 20 transformadores de distribuci\u00f3n para fortalecer el servicio el\u00e9ctrico en los municipios Alberto Adriani, Julio C\u00e9sar Salas, Libertador, Rivas D\u00e1vila, Aricagua, Antonio Pinto Salinas, Campo El\u00edas, Miranda y Sucre.<\/p>\n\n\n\n<p>El abordaje responde a las solicitudes canalizadas a trav\u00e9s de la L\u00ednea VenApp, consolid\u00e1ndose en las comunidades de los ejes Mocot\u00edes, Metropolitano, Panamericano, P\u00e1ramo y Pueblos del Sur.<\/p>\n\n\n\n<p>Estas acciones, inscritas en la 2T: Ciudades Humanas para el Buen Vivir, Servicios P\u00fablicos e Infraestructura, permiten atender de forma oportuna las prioridades comunitarias en materia de sustituci\u00f3n de equipos de potencia, mantenimiento, optimizaci\u00f3n del alumbrado p\u00fablico, atenci\u00f3n de aver\u00edas y control de vegetaci\u00f3n, fortaleciendo as\u00ed la operatividad y calidad del servicio el\u00e9ctrico.<\/p>\n\n\n\n<p><strong>Prensa MPPEE\u2013CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.- Durante el mes de septiembre, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instal\u00f3 20 transformadores de distribuci\u00f3n para fortalecer el<\/p>\n","protected":false},"author":24,"featured_media":101117,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2742,2751],"class_list":["post-101116","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-merida","tag-transformadores"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101116"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101116\/revisions"}],"predecessor-version":[{"id":101120,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101116\/revisions\/101120"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101117"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}