{"id":101303,"date":"2025-10-10T15:06:08","date_gmt":"2025-10-10T15:06:08","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101303"},"modified":"2025-10-10T15:06:10","modified_gmt":"2025-10-10T15:06:10","slug":"corpoelec-ejecuta-plan-de-control-de-vegetacion-y-mantenimiento-integral-en-carabobo","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101303","title":{"rendered":"CORPOELEC ejecuta\u00a0plan de control de vegetaci\u00f3n y mantenimiento integral en Carabobo"},"content":{"rendered":"\n<p><br><strong>Estado Carabobo.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) contin\u00faa el plan de mantenimiento preventivo y correctivo para fortalecer la operatividad de los circuitos de distribuci\u00f3n en los municipios Juan Jos\u00e9 Mora, Puerto Cabello y San Diego del estado Carabobo.<\/p>\n\n\n\n<p>Estas labores preventivas en los corredores de l\u00edneas favorecen a m\u00e1s de 30 mil familias de la entidad, garantizando un servicio el\u00e9ctrico m\u00e1s estable y seguro.<\/p>\n\n\n\n<p>El mantenimiento que contribuye a la operatividad del sistema abarc\u00f3 el despeje de 8.5 kil\u00f3metros de l\u00edneas. En Juan Jos\u00e9 Mora, se ejecutaron 3.2 km de control de vegetaci\u00f3n en el circuito Mor\u00f3n y se instalaron nuevos equipos y comoonentes en sectores como La L\u00ednea Sanguijuela. En San Diego, se despejaron 1.5 km del circuito Morro II (Urb. Morro II y Esmeralda) y 0.3 km del circuito Tulip\u00e1n (Urb. Tulip\u00e1n y El Remanso). Adem\u00e1s, en Puerto Cabello, se ejecutaron 3.5 km de control de vegetaci\u00f3n y tala en el circuito San Esteban.<\/p>\n\n\n\n<p>Esta atenci\u00f3n responde al compromiso del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de CORPOELEC, con el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Carabobo.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) contin\u00faa el plan de mantenimiento preventivo y correctivo para fortalecer la operatividad de<\/p>\n","protected":false},"author":22,"featured_media":101304,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2692,3062,2691,11,2744,46],"class_list":["post-101303","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-carabobo","tag-control-de-vegetacion","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101303"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101303\/revisions"}],"predecessor-version":[{"id":101305,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101303\/revisions\/101305"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101304"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}