{"id":101398,"date":"2025-10-14T16:37:57","date_gmt":"2025-10-14T16:37:57","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101398"},"modified":"2025-10-14T16:37:59","modified_gmt":"2025-10-14T16:37:59","slug":"instalan-62-transformadores-en-comunidades-mirandinas-para-garantizar-distribucion-de-energia","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101398","title":{"rendered":"Instalan 62 transformadores en comunidades mirandinas para garantizar distribuci\u00f3n de energ\u00eda"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Las cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instalaron, durante el mes de septiembre, 62 transformadores en comunidades del estado Miranda, con el objetivo de garantizar la continuidad del servicio el\u00e9ctrico.<\/p>\n\n\n\n<p>La ubicaci\u00f3n de los nuevos equipos, con capacidades entre 15\u202fkVA y 100\u202fkVA, se realiz\u00f3 en los municipios Tom\u00e1s Lander, Crist\u00f3bal Rojas, Paz Castillo, Independencia y Urdaneta del eje Valles del Tuy, as\u00ed como en los municipios Bri\u00f3n, P\u00e1ez, Pedro Gual y Acevedo de Barlovento.<\/p>\n\n\n\n<p>Los operarios tambi\u00e9n cumplieron labores similares en Guarenas, Guatire, Carrizal y Los Teques, beneficiando a 1.725 usuarios residenciales y comerciales.<\/p>\n\n\n\n<p>Con la conexi\u00f3n de estos equipos de potencia, se da respuesta oportuna a requerimientos canalizados mediante la L\u00ednea VenApp del Sistema 1&#215;10 del Buen Gobierno.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Las cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instalaron, durante el mes de septiembre, 62 transformadores en comunidades<\/p>\n","protected":false},"author":24,"featured_media":101408,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,2751],"class_list":["post-101398","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-transformadores"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101398"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101398\/revisions"}],"predecessor-version":[{"id":101409,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101398\/revisions\/101409"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101408"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101398"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}