{"id":101528,"date":"2025-10-20T08:30:00","date_gmt":"2025-10-20T08:30:00","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101528"},"modified":"2025-10-20T13:28:20","modified_gmt":"2025-10-20T13:28:20","slug":"mas-de-6-mil-familias-bolivarenses-beneficiadas-con-la-instalacion-de-transformadores","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101528","title":{"rendered":"M\u00e1s de 6 mil familias bolivarenses beneficiadas con la instalaci\u00f3n de transformadores"},"content":{"rendered":"\n<p><strong>Estado Bol\u00edvar.- <\/strong>Dando respuesta a las solicitudes canalizadas a trav\u00e9s de la L\u00ednea VenApp, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) en el estado Bol\u00edvar ha instalado un total de 62 transformadores de distintas capacidades durante el mes de octubre, benefician aproximadamente a 6.900 habitantes de ocho municipios.<\/p>\n\n\n\n<p>El mayor n\u00famero de atenciones se registr\u00f3 en el municipio Caron\u00ed con la instalaci\u00f3n de 30 equipos. Tambi\u00e9n se dio respuesta efectiva y oportuna en Angostura del Orinoco (18), Piar (5), El Callao (4), Sifontes (03), Roscio (1), Bolivariano de Angostura (1).<\/p>\n\n\n\n<p>Adicionalmente, se instalaron dos transformadores en el municipio Casacoima del estado Delta Amacuro, extendiendo la capacidad de respuesta a las comunidades aleda\u00f1as al territorio.<\/p>\n\n\n\n<p>Estas acciones fortalecen el suministro de energ\u00eda el\u00e9ctrica y forman parte del compromiso de CORPOELEC con el bienestar de la poblaci\u00f3n, optimizando las redes el\u00e9ctricas y garantizando un servicio m\u00e1s confiable para los venezolanos.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Bol\u00edvar.- Dando respuesta a las solicitudes canalizadas a trav\u00e9s de la L\u00ednea VenApp, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) en<\/p>\n","protected":false},"author":24,"featured_media":101529,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2723,2691,2761,2751,2868],"class_list":["post-101528","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-bolivar","tag-corpoelec","tag-delta-amacuro","tag-transformadores","tag-venapp"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101528"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101528\/revisions"}],"predecessor-version":[{"id":101530,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101528\/revisions\/101530"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101529"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}