{"id":101536,"date":"2025-10-18T14:56:13","date_gmt":"2025-10-18T14:56:13","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101536"},"modified":"2025-10-18T14:57:26","modified_gmt":"2025-10-18T14:57:26","slug":"mantenimiento-en-la-subestacion-cumana-iii-mejora-el-servicio-electrico-a-mas-de-8-mil-familias","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101536","title":{"rendered":"Mantenimiento en la subestaci\u00f3n Cuman\u00e1 III mejora el servicio el\u00e9ctrico a m\u00e1s de 8 mil familias"},"content":{"rendered":"\n<p><strong>Estado Sucre.- <\/strong>Para beneficiar a m\u00e1s de 8 mil familias a trav\u00e9s del suministro \u00f3ptimo de la energ\u00eda, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realiz\u00f3 labores de mantenimiento preventivo para fortalecer la operatividad de la subestaci\u00f3n Cuman\u00e1 III, ubicada en la ciudad de Cuman\u00e1.<\/p>\n\n\n\n<p>Asimismo, se realiz\u00f3 jornada de control de vegetaci\u00f3n en patios de maniobras, cerca perim\u00e9trica, caminer\u00edas, adyacencias de la infraestructura el\u00e9ctrica.<\/p>\n\n\n\n<p>Estas acciones garantizan la estabilidad del suministro de la electricidad en las comunidades: Los Lirios, Santa Isabel, Santa Rita, La Providencia, Santa Elena Town House, Cantarrana, Villa Martha, Cerro Sabino, Las Cu\u00f1as, Guarapiche, Santa Eduviges, as\u00ed como las avenidas Rotaria y Andr\u00e9s Eloy Blanco, pertenecientes a las parroquias Santa In\u00e9s y Valent\u00edn Valiente.\u00a0<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de CORPOELEC, reafirma su compromiso con el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN), mediante la ejecuci\u00f3n del Plan Nacional de Mantenimiento de Subestaciones en el oriente del pa\u00eds.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Sucre.- Para beneficiar a m\u00e1s de 8 mil familias a trav\u00e9s del suministro \u00f3ptimo de la energ\u00eda, la Corporaci\u00f3n<\/p>\n","protected":false},"author":22,"featured_media":101539,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,11,2744,2693,46],"class_list":["post-101536","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-sucre","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101536"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101536\/revisions"}],"predecessor-version":[{"id":101538,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101536\/revisions\/101538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101539"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}