{"id":101667,"date":"2025-10-23T14:34:02","date_gmt":"2025-10-23T14:34:02","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101667"},"modified":"2025-10-23T14:34:03","modified_gmt":"2025-10-23T14:34:03","slug":"labores-correctivas-fortalecen-red-electrica-y-alumbrado-publico-en-los-circuitos-torres-y-saladillo","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101667","title":{"rendered":"Labores correctivas fortalecen red el\u00e9ctrica y alumbrado p\u00fablico en los circuitos Torres y Saladillo"},"content":{"rendered":"\n<p><strong>Estado Zulia.- <\/strong>Como parte del programa de adecuaci\u00f3n de las redes el\u00e9ctricas que ejecuta la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), se realizaron mantenimiento en los circuitos Torres Prensa y Saladillo, ubicados en el centro de Maracaibo, en el contexto de las labores previas a la tradicional bajada de la Virgen del Chiquinquir\u00e1.<\/p>\n\n\n\n<p>Las maniobras t\u00e9cnicas incluyeron conexiones el\u00e9ctricas, instalaci\u00f3n de bancos de condensadores, sustituci\u00f3n de cortacorrientes y fusibles, as\u00ed como la aplicaci\u00f3n del Plan Nacional de Control de Vegetaci\u00f3n en la red de media y baja tensi\u00f3n de ambos circuitos, con el prop\u00f3sito de optimizar el servicio el\u00e9ctrico.<\/p>\n\n\n\n<p>Asimismo, se realiz\u00f3 mantenimiento integral al alumbrado p\u00fablico con el reemplazo de 86 luminarias tipo LED, para mejorar la iluminaci\u00f3n y seguridad vial de la feligres\u00eda zuliana que asiste al encuentro de la Chinita con su pueblo.<\/p>\n\n\n\n<p>Estas acciones fortalecen la operatividad del sistema el\u00e9ctrico en Maracaibo y reafirman el compromiso de CORPOELEC con el bienestar de la poblaci\u00f3n zuliana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.- Como parte del programa de adecuaci\u00f3n de las redes el\u00e9ctricas que ejecuta la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), se<\/p>\n","protected":false},"author":24,"featured_media":101668,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2771,2691,3412,3413,2694],"class_list":["post-101667","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-alumbrado-publico","tag-corpoelec","tag-saladillo","tag-torres","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101667"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101667\/revisions"}],"predecessor-version":[{"id":101669,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101667\/revisions\/101669"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101668"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101667"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101667"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}