{"id":101691,"date":"2025-10-24T14:25:04","date_gmt":"2025-10-24T14:25:04","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101691"},"modified":"2025-10-24T14:26:22","modified_gmt":"2025-10-24T14:26:22","slug":"101691","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101691","title":{"rendered":"A trav\u00e9s de la VenApp, refuerzan distribuci\u00f3n de energ\u00eda con nuevos transformadores en Cabimas"},"content":{"rendered":"\n<p><strong>Estado Zulia.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) garantiza la continuidad del servicio con la instalaci\u00f3n de un transformador de 50\u202fkVA en el sector Campo Lindo, beneficiando de manera directa a 12 familias de esta comunidad zuliana.<\/p>\n\n\n\n<p>Las labores comprendieron la incorporaci\u00f3n de componentes esenciales del transformador, como cortacorriente y pararrayos, a fin de garantizar su operatividad.<\/p>\n\n\n\n<p>Asimismo, se atendi\u00f3 el sector R10 de la parroquia La Rosa, con la instalaci\u00f3n de dos equipos de distribuci\u00f3n de energ\u00eda de 50\u202fkVA. De igual forma, el personal t\u00e9cnico se despleg\u00f3 en las parroquias Germ\u00e1n R\u00edos Linares y San Benito, brindando atenci\u00f3n a las comunidades Los Laureles y el sector H5.<\/p>\n\n\n\n<p>La instalaci\u00f3n de estos equipos el\u00e9ctricos mejora la distribuci\u00f3n de la energ\u00eda y brinda bienestar al Poder Popular mediante la aplicaci\u00f3n VenApp del Sistema 1&#215;10 del Buen Gobierno, fortaleciendo la infraestructura operativa en zonas residenciales del municipio Cabimas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) garantiza la continuidad del servicio con la instalaci\u00f3n de un transformador de 50\u202fkVA<\/p>\n","protected":false},"author":24,"featured_media":101692,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[3387,2751,2694],"class_list":["post-101691","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-cabimas","tag-transformadores","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101691"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101691\/revisions"}],"predecessor-version":[{"id":101694,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101691\/revisions\/101694"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101692"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}