{"id":101726,"date":"2025-10-25T13:49:06","date_gmt":"2025-10-25T13:49:06","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101726"},"modified":"2025-10-25T13:49:09","modified_gmt":"2025-10-25T13:49:09","slug":"fortalecen-servicio-electrico-en-zona-fronteriza-del-tachira-con-instalacion-de-transformador","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101726","title":{"rendered":"Fortalecen servicio el\u00e9ctrico en zona fronteriza del T\u00e1chira con instalaci\u00f3n de transformador"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instal\u00f3 un transformador de 50 kVA en la carrera 13, entre calles 7 y 8 de San Antonio, en el municipio Bol\u00edvar del estado T\u00e1chira, beneficiando a 60 familias de esta zona fronteriza.<\/p>\n\n\n\n<p>Esta acci\u00f3n responde a solicitudes canalizadas a trav\u00e9s de la aplicaci\u00f3n VenApp del Sistema 1&#215;10 del Buen Gobierno, como parte de las <a href=\"https:\/\/mppee.gob.ve\/?p=101577\" data-type=\"link\" data-id=\"https:\/\/mppee.gob.ve\/?p=101577\">instrucciones del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro<\/a>, orientadas a fortalecer la capacidad de respuesta y la articulaci\u00f3n territorial.<\/p>\n\n\n\n<p>Zuleima Agelvis, jefa de comunidad del Barrio Sim\u00f3n Bol\u00edvar, sector B, destac\u00f3 las pol\u00edticas efectivas del Gobierno Nacional y la plataforma VenApp, que permitieron resolver de forma inmediata la situaci\u00f3n del servicio el\u00e9ctrico residencial y comercial en la zona.<\/p>\n\n\n\n<p>La jornada tambi\u00e9n incluy\u00f3 labores de mantenimiento preventivo en conductores de media tensi\u00f3n a\u00e9rea expuestos al paso peatonal y vehicular, mejorando la seguridad operativa para la poblaci\u00f3n de San Antonio.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instal\u00f3 un transformador de 50 kVA en la carrera 13, entre calles 7<\/p>\n","protected":false},"author":24,"featured_media":101727,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2688,2691,2714,2700,2868],"class_list":["post-101726","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-1x10-del-buen-gobierno","tag-corpoelec","tag-nicolas-maduro","tag-tachira","tag-venapp"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101726"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101726\/revisions"}],"predecessor-version":[{"id":101728,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101726\/revisions\/101728"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101727"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}