{"id":101753,"date":"2025-10-27T14:29:49","date_gmt":"2025-10-27T14:29:49","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101753"},"modified":"2025-10-27T14:29:51","modified_gmt":"2025-10-27T14:29:51","slug":"optimizan-suministro-electrico-en-centros-de-salud-del-municipio-guajira","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101753","title":{"rendered":"Optimizan suministro el\u00e9ctrico en centros de salud del municipio Guajira"},"content":{"rendered":"\n<p><strong>Estado Zulia.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 el mantenimiento e instalaci\u00f3n de dos transformadores de 167.5\u202fkVA en el Hospital Binacional de Paraguaipoa, en el municipio Guajira del estado Zulia, con el objetivo de garantizar la continuidad del servicio el\u00e9ctrico y la atenci\u00f3n en materia de salud a m\u00e1s de 88.000 habitantes.<\/p>\n\n\n\n<p>Los trabajos se centraron en el mantenimiento y seguridad de las conexiones el\u00e9ctricas, incluyendo las l\u00edneas trif\u00e1sicas y el cableado subterr\u00e1neo, para asegurar un suministro \u00f3ptimo en todas las \u00e1reas hospitalarias.<\/p>\n\n\n\n<p>Asimismo, el personal t\u00e9cnico ejecut\u00f3 maniobras integrales en el Centro Diagn\u00f3stico Integral (CDI) Paraguipoa. Entre las labores efectuadas destacan el reemplazo de los cortacorrientes del transformador de 150\u202fkVA, la instalaci\u00f3n de pararrayos y el mantenimiento de las terminaciones exteriores.<\/p>\n\n\n\n<p>El mantenimiento de los equipos de distribuci\u00f3n de energ\u00eda contribuye con el buen funcionamiento de las \u00e1reas de atenci\u00f3n de salud para los habitantes de las comunidades ind\u00edgenas, fortaleciendo el sistema el\u00e9ctrico en espacios esenciales para el bienestar colectivo.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 el mantenimiento e instalaci\u00f3n de dos transformadores de 167.5\u202fkVA en el Hospital<\/p>\n","protected":false},"author":24,"featured_media":101754,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,3115,2694],"class_list":["post-101753","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-guajira","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101753"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101753\/revisions"}],"predecessor-version":[{"id":101755,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101753\/revisions\/101755"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101754"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}