{"id":101759,"date":"2025-10-27T16:36:14","date_gmt":"2025-10-27T16:36:14","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101759"},"modified":"2025-10-27T16:36:16","modified_gmt":"2025-10-27T16:36:16","slug":"despliegue-en-subestacion-los-pilones-garantiza-distribucion-de-energia-a-mas-de-10-mil-usuarios-en-anaco","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101759","title":{"rendered":"Despliegue en subestaci\u00f3n Los Pilones garantiza distribuci\u00f3n de energ\u00eda a m\u00e1s de 10 mil usuarios en Anaco"},"content":{"rendered":"\n<p><strong>Estado Anzo\u00e1tegui.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) intervino la subestaci\u00f3n Los Pilones, ubicada en el estado Anzo\u00e1tegui, con el objetivo de aplicar mantenimiento preventivo a sus elementos asociados, mejorando las condiciones operativas de esta unidad que surte energ\u00eda a m\u00e1s de 10 mil usuarios de Anaco.<\/p>\n\n\n\n<p>El personal especializado ejecut\u00f3 labores de correcci\u00f3n de gradientes t\u00e9rmicos, adem\u00e1s de brindar soporte t\u00e9cnico y realiz\u00f3 tareas de lubricaci\u00f3n de componentes clave, optimizando el desempe\u00f1o de equipos esenciales.<\/p>\n\n\n\n<p>Con estas acciones, CORPOELEC reafirma su compromiso con el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN), garantizando mayor estabilidad operativa y calidad en el servicio para las familias del eje central del estado Anzo\u00e1tegui.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Anzo\u00e1tegui.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) intervino la subestaci\u00f3n Los Pilones, ubicada en el estado Anzo\u00e1tegui, con el objetivo<\/p>\n","protected":false},"author":24,"featured_media":101760,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2706,2691,3421],"class_list":["post-101759","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-anzoategui","tag-corpoelec","tag-los-pilones"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101759"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101759\/revisions"}],"predecessor-version":[{"id":101761,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101759\/revisions\/101761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101760"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}