{"id":101981,"date":"2025-11-05T14:08:09","date_gmt":"2025-11-05T14:08:09","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=101981"},"modified":"2025-11-05T14:08:20","modified_gmt":"2025-11-05T14:08:20","slug":"mas-de-cuatro-mil-familias-araguenas-beneficiadas-con-instalacion-de-transformadores","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=101981","title":{"rendered":"M\u00e1s de cuatro mil familias arag\u00fce\u00f1as beneficiadas con instalaci\u00f3n de transformadores"},"content":{"rendered":"\n<p><strong>Estado Aragua.-<\/strong> En los \u00faltimos tres meses, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instal\u00f3 m\u00e1s de 100 transformadores en 110 comunidades de los municipios Girardot, Libertador, Ribas, Sucre y Urdaneta, beneficiando a m\u00e1s de 4 mil familias del estado Aragua.<\/p>\n\n\n\n<p>Estas labores forman parte de las acciones orientadas a garantizar la continuidad y confiabilidad del servicio el\u00e9ctrico en sectores residenciales y comerciales. Los equipos instalados, con capacidades que var\u00edan entre 25 y 75.5 kVA, fueron ajustados a las necesidades espec\u00edficas de cada comunidad, optimizando el suministro energ\u00e9tico en estas zonas.<\/p>\n\n\n\n<p>La incorporaci\u00f3n de nuevos dispositivos fortalece la infraestructura el\u00e9ctrica regional, contribuyendo al bienestar de las familias arag\u00fce\u00f1as y al desarrollo local.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de CORPOELEC, contin\u00faa dando prioridad a las solicitudes canalizadas mediante la aplicaci\u00f3n VenApp del Sistema 1&#215;10 del Buen Gobierno, con atenci\u00f3n directa a las necesidades del pueblo venezolano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Aragua.- En los \u00faltimos tres meses, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instal\u00f3 m\u00e1s de 100 transformadores en 110 comunidades<\/p>\n","protected":false},"author":24,"featured_media":101982,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2708,2691,2751],"class_list":["post-101981","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-aragua","tag-corpoelec","tag-transformadores"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=101981"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101981\/revisions"}],"predecessor-version":[{"id":101985,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/101981\/revisions\/101985"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/101982"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=101981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=101981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=101981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}