{"id":102290,"date":"2025-11-17T15:16:13","date_gmt":"2025-11-17T15:16:13","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=102290"},"modified":"2025-11-17T15:16:15","modified_gmt":"2025-11-17T15:16:15","slug":"adecuaciones-a-la-red-de-distribucion-de-circuitos-de-carayaca-benefician-a-mas-de-24-mil-guairenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=102290","title":{"rendered":"Adecuaciones a la red de distribuci\u00f3n de circuitos de Carayaca benefician a m\u00e1s de 24 mil guaire\u00f1os"},"content":{"rendered":"\n<p><strong>Estado La Guaira.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores operativas para optimizar la red el\u00e9ctrica de los circuitos Picure A4, B1 y Carayaca A2, ubicados en la parroquia Carayaca, con el objetivo de garantizar un servicio el\u00e9ctrico confiable a 24.818 habitantes del estado La Guaira.<\/p>\n\n\n\n<p>Estas acciones contemplaron la sustituci\u00f3n de componentes el\u00e9ctricos en los sectores Oricao y La Alegr\u00eda, as\u00ed como la instalaci\u00f3n de un equipo de potencia de 50 kVA en la comunidad de Las Salinas, lo que permite fortalecer el suministro de electricidad en las zonas asociadas a los circuitos mencionados.<\/p>\n\n\n\n<p>Con estas maniobras, se mejora la capacidad operativa del sistema de distribuci\u00f3n en esta parroquia costera, favoreciendo significativamente al sector residencial y comercial.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica y CORPOELEC contin\u00faan trabajando de manera articulada para fortalecer el Sistema El\u00e9ctrico Nacional (SEN) y avanzar en la mejora constante del servicio en el estado La Guaira.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores operativas para optimizar la red el\u00e9ctrica de los circuitos Picure<\/p>\n","protected":false},"author":24,"featured_media":102291,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2818,2691,2777,2743],"class_list":["post-102290","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-carayaca","tag-corpoelec","tag-distribucion","tag-la-guaira"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102290"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102290\/revisions"}],"predecessor-version":[{"id":102292,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102290\/revisions\/102292"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/102291"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}