{"id":102413,"date":"2025-11-22T13:45:24","date_gmt":"2025-11-22T13:45:24","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=102413"},"modified":"2025-11-22T13:45:24","modified_gmt":"2025-11-22T13:45:24","slug":"mas-de-10-mil-familias-beneficiadas-con-mantenimiento-en-circuitos-trujillanos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=102413","title":{"rendered":"M\u00e1s de 10 mil familias beneficiadas con mantenimiento en circuitos trujillanos"},"content":{"rendered":"\n<p><strong>Estado Trujillo.-<\/strong> Con el prop\u00f3sito de mejorar el servicio el\u00e9ctrico brindado a m\u00e1s de 10 mil usuarios, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de mantenimiento preventivo en redes de distribuci\u00f3n del estado Trujillo.<\/p>\n\n\n\n<p>Las acciones incluyeron el despeje de vegetaci\u00f3n sobre el tendido el\u00e9ctrico, correcci\u00f3n de puntos calientes, ajuste y lubricaci\u00f3n en los puntos de seccionamiento, as\u00ed como la adecuaci\u00f3n y sustituci\u00f3n de componentes el\u00e9ctricos, optimizando la estabilidad del suministro.<\/p>\n\n\n\n<p>Entre los circuitos atendidos se encuentran El Valle, Motat\u00e1n, Cuicas, Valera II y El Milagro, lo que permite garantizar un servicio el\u00e9ctrico m\u00e1s estable y seguro, reduciendo riesgos operativos y fortaleciendo la infraestructura de distribuci\u00f3n.<\/p>\n\n\n\n<p>Estas labores forman parte del compromiso del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica y CORPOELEC con el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN) y la mejora continua de la calidad del servicio en la regi\u00f3n andina.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Trujillo.- Con el prop\u00f3sito de mejorar el servicio el\u00e9ctrico brindado a m\u00e1s de 10 mil usuarios, la Corporaci\u00f3n El\u00e9ctrica<\/p>\n","protected":false},"author":24,"featured_media":102414,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2794,2691,2777,2704,2702],"class_list":["post-102413","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-circuitos-electricos","tag-corpoelec","tag-distribucion","tag-mantenimiento","tag-trujillo"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102413"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102413\/revisions"}],"predecessor-version":[{"id":102415,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102413\/revisions\/102415"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/102414"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102413"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}