{"id":102475,"date":"2025-11-25T19:09:03","date_gmt":"2025-11-25T19:09:03","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=102475"},"modified":"2025-11-25T19:09:05","modified_gmt":"2025-11-25T19:09:05","slug":"control-de-vegetacion-optimiza-la-distribucion-del-servicio-en-18-circuitos-apurenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=102475","title":{"rendered":"Control de vegetaci\u00f3n optimiza la distribuci\u00f3n del servicio en 18 circuitos apure\u00f1os"},"content":{"rendered":"\n<p><strong>Estado Apure.-<\/strong> Las cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) efectuaron labores de mantenimiento preventivo en m\u00e1s de 1.560 metros de corredores de servicio, beneficiando a 136.500 habitantes de los municipios San Fernando, Biruaca, Achaguas, Mu\u00f1oz, R\u00f3mulo Gallegos y P\u00e1ez del estado Apure.<\/p>\n\n\n\n<p>La adecuaci\u00f3n consisti\u00f3 en el corte selectivo de ramas cercanas a las l\u00edneas de media y baja tensi\u00f3n correspondientes a los circuitos Tamarindo, avenida Primero de Mayo, Gobernaci\u00f3n, Hospital, Sam\u00e1n Llor\u00f3n, Libertador, Soleos, Plasergas, Biruaca-Domo, CORPOELEC, Elorza, El Amparo, Los Corrales, El Nula, El Yagual, Santa Rita, R\u00f3mulo Gallegos y Trinidad de Orichuna.<\/p>\n\n\n\n<p>Estas acciones responden a las solicitudes registradas en el Sistema 1\u00d710 del Buen Gobierno, impulsado por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, en cumplimiento de los planes estrat\u00e9gicos orientados a fortalecer los servicios p\u00fablicos en el territorio nacional.<\/p>\n\n\n\n<p>El Plan de Adecuaci\u00f3n y Mantenimiento de Circuitos El\u00e9ctricos y Subestaciones est\u00e1 centrado en robustecer el Sistema El\u00e9ctrico Nacional (SEN), garantizando la estabilidad del suministro de energ\u00eda a millones de hogares venezolanos.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Apure.- Las cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) efectuaron labores de mantenimiento preventivo en m\u00e1s de 1.560 metros<\/p>\n","protected":false},"author":24,"featured_media":102476,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2722,3062,2691],"class_list":["post-102475","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-apure","tag-control-de-vegetacion","tag-corpoelec"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102475"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102475\/revisions"}],"predecessor-version":[{"id":102477,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102475\/revisions\/102477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/102476"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}