{"id":102478,"date":"2025-11-25T19:32:16","date_gmt":"2025-11-25T19:32:16","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=102478"},"modified":"2025-11-25T19:32:19","modified_gmt":"2025-11-25T19:32:19","slug":"fortalecen-operatividad-de-la-linea-de-transmision-santa-teresa-camatagua","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=102478","title":{"rendered":"Fortalecen operatividad de la l\u00ednea de transmisi\u00f3n Santa Teresa \u2013 Camatagua"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>Con el objetivo de favorecer a m\u00e1s de 60 mil usuarios, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de mantenimiento preventivo y correctivo en la l\u00ednea de transmisi\u00f3n Santa Teresa \u2013 Camatagua a 115 kV,<\/p>\n\n\n\n<p>Los trabajos incluyeron el despeje de vegetaci\u00f3n en los vanos de siete torres, as\u00ed como el reemplazo de componentes y cadenas de aisladores utilizados en l\u00edneas de alta tensi\u00f3n para soportar los conductores, asegurando el flujo constante de la corriente el\u00e9ctrica hacia las estructuras.<\/p>\n\n\n\n<p>Estas acciones favorecen directamente el sistema de bombeo en las estaciones de Hidrocapital 31 y Mamonal, adem\u00e1s del alimentador Inos de la subestaci\u00f3n Camatagua 115 kV, fortaleciendo la capacidad operativa de instalaciones para el suministro de agua y energ\u00eda en la entidad.<\/p>\n\n\n\n<p>CORPOELEC reafirma su compromiso de trabajar de manera articulada y constante para garantizar un servicio el\u00e9ctrico eficiente y confiable, en beneficio de la poblaci\u00f3n venezolana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Con el objetivo de favorecer a m\u00e1s de 60 mil usuarios, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores<\/p>\n","protected":false},"author":24,"featured_media":102479,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[3480,2691,2709,3479],"class_list":["post-102478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-camatagua","tag-corpoelec","tag-miranda","tag-santa-teresa"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102478"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102478\/revisions"}],"predecessor-version":[{"id":102480,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102478\/revisions\/102480"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/102479"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}