{"id":102835,"date":"2025-12-10T14:20:06","date_gmt":"2025-12-10T14:20:06","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=102835"},"modified":"2025-12-10T14:20:11","modified_gmt":"2025-12-10T14:20:11","slug":"corpoelec-optimiza-sistema-de-iluminacion-en-instalaciones-electricas-de-independencia-y-tomas-lander","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=102835","title":{"rendered":"CORPOELEC optimiza sistema de iluminaci\u00f3n en instalaciones el\u00e9ctricas de Independencia y Tom\u00e1s Lander"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 mejoras en el sistema de iluminaci\u00f3n de las subestaciones el\u00e9ctricas Santa Teresa III y Ocumare II, ubicadas en los municipios Independencia y Tom\u00e1s Lander, con el objetivo de optimizar la operatividad y seguridad del servicio en el estado Miranda.<\/p>\n\n\n\n<p>La intervenci\u00f3n incluy\u00f3 la reparaci\u00f3n y sustituci\u00f3n de luminarias, el ajuste del cableado y la instalaci\u00f3n de nuevas l\u00e1mparas con tecnolog\u00eda LED de 200 watts. Este avance eleva la eficiencia energ\u00e9tica y garantiza una mejor iluminaci\u00f3n durantes las horas nocturnas.<\/p>\n\n\n\n<p>Estas labores garantizan el correcto funcionamiento de los equipos, fortaleciendo la transmisi\u00f3n de energ\u00eda y aumentando la confiabilidad del sistema el\u00e9ctrico en los Valles del Tuy, Barlovento y La Gran Caracas.<\/p>\n\n\n\n<p>El Gobierno Nacional, a trav\u00e9s de CORPOELEC, reafirma su compromiso con la modernizaci\u00f3n del Sistema El\u00e9ctrico Nacional (SEN), impulsando maniobras de mantenimiento preventivo y correctivo para asegurar un servicio confiable en beneficio del pueblo mirandino.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 mejoras en el sistema de iluminaci\u00f3n de las subestaciones el\u00e9ctricas Santa Teresa<\/p>\n","protected":false},"author":24,"featured_media":102836,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2756,2709,2744],"class_list":["post-102835","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-iluminacion","tag-miranda","tag-sen"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102835"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102835\/revisions"}],"predecessor-version":[{"id":102837,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102835\/revisions\/102837"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/102836"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}