{"id":102864,"date":"2025-12-11T15:47:09","date_gmt":"2025-12-11T15:47:09","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=102864"},"modified":"2025-12-11T15:47:18","modified_gmt":"2025-12-11T15:47:18","slug":"corpoelec-fortalece-transmision-de-energia-en-caracas-y-valles-del-tuy","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=102864","title":{"rendered":"CORPOELEC fortalece transmisi\u00f3n de energ\u00eda en Caracas y Valles del Tuy"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> En un despliegue orientado a fortalecer las condiciones operativas, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores preventivas en las subestaciones Guaicaipuro 230 kV y Santa Luc\u00eda 115 kV, ubicadas en los municipios Crist\u00f3bal Rojas y Paz Castillo, con el objetivo de elevar la confiabilidad de los sistemas de transmisi\u00f3n en el estado Miranda.<\/p>\n\n\n\n<p>La atenci\u00f3n especializada del personal t\u00e9cnico consisti\u00f3 en el mantenimiento de los sistemas de control de protecciones, componentes el\u00e9ctricos, revisi\u00f3n exhaustiva de interruptores y movilizaci\u00f3n de estructuras, piezas clave para optimizar el flujo seguro de la energ\u00eda.<\/p>\n\n\n\n<p>Estos esfuerzos benefician de manera directa a los residentes de los ejes Valles del Tuy y la Gran Caracas, consolidando la mejora continua del Sistema El\u00e9ctrico Nacional (SEN), en cumplimiento de los lineamientos del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro Moros.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- En un despliegue orientado a fortalecer las condiciones operativas, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores preventivas en<\/p>\n","protected":false},"author":24,"featured_media":102865,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[111,2691,2709,2798,2905],"class_list":["post-102864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-caracas","tag-corpoelec","tag-miranda","tag-transmision","tag-valles-del-tuy"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102864"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102864\/revisions"}],"predecessor-version":[{"id":102866,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102864\/revisions\/102866"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/102865"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}