{"id":102883,"date":"2025-12-12T16:42:53","date_gmt":"2025-12-12T16:42:53","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=102883"},"modified":"2025-12-12T16:42:56","modified_gmt":"2025-12-12T16:42:56","slug":"corpoelec-fortalece-suministro-electrico-en-el-eje-turistico-de-galipan","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=102883","title":{"rendered":"CORPOELEC fortalece suministro el\u00e9ctrico en el eje tur\u00edstico de Galip\u00e1n"},"content":{"rendered":"\n<p><strong>Estado La Guaira.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) incorporaron nuevos componentes a la red de distribuci\u00f3n para robustecer el suministro el\u00e9ctrico en el eje tur\u00edstico de Galip\u00e1n, beneficiando a m\u00e1s de 3 mil habitantes de la parroquia Macuto del estado La Guaira.<\/p>\n\n\n\n<p>Las labores realizadas en el circuito Casino incluyeron la sustituci\u00f3n de equipos el\u00e9ctricos, optimizando el funcionamiento de la red de media tensi\u00f3n en los sectores San Isidro, San Antonio, San Jos\u00e9, San Francisco y Manzanares.<\/p>\n\n\n\n<p>Asimismo, se efectuaron trabajos de despeje de vegetaci\u00f3n sobre las l\u00edneas y \u00e1reas adyacentes a las estructuras el\u00e9ctricas, garantizando la continuidad del servicio en las zonas de Galip\u00e1n.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de CORPOELEC, reafirman su compromiso de dar respuesta oportuna a la poblaci\u00f3n del Litoral Central y consolidar la estabilidad del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) incorporaron nuevos componentes a la red de distribuci\u00f3n para robustecer el suministro<\/p>\n","protected":false},"author":24,"featured_media":102884,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2777,3514,3490],"class_list":["post-102883","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-distribucion","tag-galipan","tag-macuto"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102883"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102883\/revisions"}],"predecessor-version":[{"id":102885,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102883\/revisions\/102885"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/102884"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}