{"id":102909,"date":"2025-12-13T14:07:25","date_gmt":"2025-12-13T14:07:25","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=102909"},"modified":"2025-12-13T14:07:27","modified_gmt":"2025-12-13T14:07:27","slug":"corpoelec-favorece-a-mas-de-155-mil-portugueseno-con-maniobras-en-la-linea-acarigua-ii-turen","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=102909","title":{"rendered":"CORPOELEC favorece a m\u00e1s de 155 mil portuguese\u00f1o con maniobras en la\u00a0 l\u00ednea Acarigua II- Tur\u00e9n\u00a0"},"content":{"rendered":"\n<p><strong>Estado Portuguesa.-<\/strong>\u00a0La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica\u00a0 Nacional (CORPOELEC) ejecut\u00f3\u00a0 labores correctivas en la l\u00ednea 115kV Acarigua II -Tur\u00e9n,\u00a0\u00a0con el prop\u00f3sito de optimizar el servicio brindado\u00a0 a m\u00e1s 155\u00a0mil usuarios\u00a0\u00a0de los municipios Esteller, Tur\u00e9n y Santa Rosal\u00eda en el estado Portuguesa.\u00a0<\/p>\n\n\n\n<p>Estas maniobras contemplaron la\u00a0inspecci\u00f3n y sustituci\u00f3n de componentes esenciales en las torres 78, 80 y 84, a fin de garantizar el funcionamiento de esta red de alta tensi\u00f3n que atiende espec\u00edficamente a residentes de\u00a0las parroquias\u00a0P\u00edritu, Uveral, Villa Bruzual, Villa Bruzual Rural, Santa Cruz, Canelones, San Isidro Labrador, Florida y El Play\u00f3n.\u00a0<\/p>\n\n\n\n<p>Los trabajos centrados en garantizar un suministro de energ\u00eda confiable, tambi\u00e9n incluyeron la revisi\u00f3n y adecuaci\u00f3n de equipos de protecci\u00f3n asociados al mencionado alimentador de alta tensi\u00f3n.\u00a0<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Portuguesa.-\u00a0La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica\u00a0 Nacional (CORPOELEC) ejecut\u00f3\u00a0 labores correctivas en la l\u00ednea 115kV Acarigua II -Tur\u00e9n,\u00a0\u00a0con<\/p>\n","protected":false},"author":22,"featured_media":102911,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,11,2725,2744,46],"class_list":["post-102909","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mppee","tag-portuguesa","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=102909"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102909\/revisions"}],"predecessor-version":[{"id":102912,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/102909\/revisions\/102912"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/102911"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=102909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=102909"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=102909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}