{"id":103016,"date":"2025-12-20T14:49:35","date_gmt":"2025-12-20T14:49:35","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=103016"},"modified":"2025-12-20T14:49:39","modified_gmt":"2025-12-20T14:49:39","slug":"instalacion-de-nuevos-transformadores-beneficia-a-1-900-familias-mirandinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=103016","title":{"rendered":"Instalaci\u00f3n de nuevos transformadores beneficia a 1.900 familias mirandinas"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Un total de 1.900 familias mirandinas fueron favorecidas con la instalaci\u00f3n de 13 nuevos transformadores de diferentes capacidades en los ejes Altos Mirandinos, Guarenas-Guatire y Valles del Tuy, como parte de las acciones de atenci\u00f3n comunitaria que ejecuta la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC).<\/p>\n\n\n\n<p>El despliegue operativo inici\u00f3 en las parroquias Cecilio Acosta, San Antonio y Los Teques, donde la clase trabajadora activ\u00f3 cuatro equipos de 25 y 300 kVA, mejorando el suministro el\u00e9ctrico en el sector Guareguare, la residencia La Sierra y la urbanizaci\u00f3n La Morita.<\/p>\n\n\n\n<p>Asimismo, las acciones t\u00e9cnicas se extendieron a los municipios Rafael Urdaneta y Crist\u00f3bal Rojas, con la instalaci\u00f3n de seis transformadores adicionales, entre 37.5 y 165.7 kVA, asociados a la red el\u00e9ctrica de los circuitos Tacata, Alvarenga, La Laguna y Las Mercedes.<\/p>\n\n\n\n<p>En el eje Guarenas-Guatire, se incorporaron tres transformadores de 50 y 100 kVA al sistema de distribuci\u00f3n, garantizando la continuidad del servicio en zonas residenciales y consolidando la atenci\u00f3n directa a las comunidades.<\/p>\n\n\n\n<p>CORPOELEC asegura el correcto funcionamiento del proceso de distribuci\u00f3n de energ\u00eda el\u00e9ctrica en las diferentes localidades mirandinas, reafirmando su compromiso con la calidad y eficiencia del servicio p\u00fablico.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Un total de 1.900 familias mirandinas fueron favorecidas con la instalaci\u00f3n de 13 nuevos transformadores de diferentes capacidades<\/p>\n","protected":false},"author":24,"featured_media":103017,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,2751],"class_list":["post-103016","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-transformadores"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103016"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103016\/revisions"}],"predecessor-version":[{"id":103018,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103016\/revisions\/103018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/103017"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}