{"id":103093,"date":"2025-12-23T18:27:28","date_gmt":"2025-12-23T18:27:28","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=103093"},"modified":"2025-12-23T18:27:51","modified_gmt":"2025-12-23T18:27:51","slug":"instalacion-de-transformadores-beneficia-a-mas-de-4-mil-familias-trujillanas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=103093","title":{"rendered":"Instalaci\u00f3n de transformadores beneficia a m\u00e1s de 4 mil familias trujillanas"},"content":{"rendered":"\n<p><strong>Estado Trujillo.- <\/strong>La\u00a0Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC)\u00a0ejecut\u00f3 la instalaci\u00f3n de 30 transformadores con capacidades de 10, 25, 37.5, 50 y 167 kVA distribuidos en 12 municipios del estado Trujillo, beneficiando a m\u00e1s de 4 mil 300 familias.<\/p>\n\n\n\n<p>La puesta en servicio de estos equipos suma una capacidad total de 1.257 kVA y garantiza la continuidad del suministro el\u00e9ctrico en los municipios Andr\u00e9s Bello, Bocon\u00f3, Candelaria, Escuque, La Ceiba, Motat\u00e1n, Pamp\u00e1n, Pampanito, Rafael Rangel, Trujillo, Urdaneta y Valera.<\/p>\n\n\n\n<p>Estas acciones forman parte de las solicitudes realizadas a trav\u00e9s de la L\u00ednea VenApp, herramienta de atenci\u00f3n oportuna impulsada por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, para fortalecer los servicios p\u00fablicos.<\/p>\n\n\n\n<p>CORPOELEC se mantiene desplegado en toda la entidad trujillana, reafirmando su compromiso en contribuir con la prestaci\u00f3n del servicio el\u00e9ctrico y el bienestar integral del pueblo.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Trujillo.- La\u00a0Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC)\u00a0ejecut\u00f3 la instalaci\u00f3n de 30 transformadores con capacidades de 10, 25, 37.5, 50 y 167<\/p>\n","protected":false},"author":22,"featured_media":103094,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,11,2744,2702,2868,46],"class_list":["post-103093","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-trujillo","tag-venapp","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103093"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103093\/revisions"}],"predecessor-version":[{"id":103095,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103093\/revisions\/103095"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/103094"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}