{"id":103180,"date":"2025-12-26T20:19:27","date_gmt":"2025-12-26T20:19:27","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=103180"},"modified":"2025-12-26T20:19:52","modified_gmt":"2025-12-26T20:19:52","slug":"supervisan-avances-del-plan-de-desarrollo-integral-del-corredor-vial-caracas-la-guaira","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=103180","title":{"rendered":"Supervisan avances del Plan de Desarrollo Integral del Corredor Vial Caracas-La Guaira"},"content":{"rendered":"\n<p><strong> San Bernandino, Caracas.-<\/strong> Dando cumplimiento a los lineamientos emanados por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, este viernes 26 de diciembre, se realiz\u00f3 una nueva Asamblea Comunal en Corredor Vial Caracas-La Guaira, liderada por el vicepresidente sectorial de Obras P\u00fablicas y Servicios, Jorge M\u00e1rquez. <\/p>\n\n\n\n<p>En compa\u00f1\u00eda de los Ministros del \u00e1rea de servicios p\u00fablicos, M\u00e1rquez constat\u00f3 los avances de las labores de diagn\u00f3stico de necesidades y trabajos en ejecuci\u00f3n en materia agua, electricidad, gas, telecomunicaciones, obras p\u00fablicas y transporte. <\/p>\n\n\n\n<p>Durante este mes de trabajo articulado entre el Poder Popular y el Estado, se han dado respuestas efectivas en torno a la vialidad, la interconexi\u00f3n, la rehabilitaci\u00f3n de espacios p\u00fablicos y la mejora en el suministro de energ\u00eda el\u00e9ctrica, agua y gas. <\/p>\n\n\n\n<p>El Plan de Desarrollo Integral del Corredor Vial Caracas-La Guaira, activado por el Jefe de Estado el pasado 19 de noviembre tiene como premisa fundamental el fortalecimiento del Poder Popular y las Comunas, tal como lo establece el Plan de las 7 Transformaciones y en articulaci\u00f3n con las instituciones. <\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>San Bernandino, Caracas.- Dando cumplimiento a los lineamientos emanados por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, este viernes 26<\/p>\n","protected":false},"author":22,"featured_media":103181,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[3527,3540,46,327],"class_list":["post-103180","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacionales","tag-corredor-vial-caracas-la-guaira","tag-poder-comunal","tag-venezuela","tag-vsops"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103180","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103180"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103180\/revisions"}],"predecessor-version":[{"id":103182,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103180\/revisions\/103182"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/103181"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103180"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103180"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103180"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}