{"id":103729,"date":"2026-01-21T15:28:43","date_gmt":"2026-01-21T15:28:43","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=103729"},"modified":"2026-01-21T15:29:13","modified_gmt":"2026-01-21T15:29:13","slug":"mejoran-sistema-electrico-con-mantenimiento-en-lineas-de-alta-tension-en-tucupita","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=103729","title":{"rendered":"Mejoran sistema el\u00e9ctrico con mantenimiento en l\u00edneas de alta tensi\u00f3n en Tucupita"},"content":{"rendered":"\n<p><strong>Estado Delta Amacuro.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de mantenimiento preventivo y correctivo en los corredores de servicios Barrancas\u2013Tucupita 115 kV, fortaleciendo la confiabilidad del sistema el\u00e9ctrico en el estado Delta Amacuro.<\/p>\n\n\n\n<p>Las acciones impactaron de manera positiva a m\u00e1s de 140 mil habitantes del municipio Tucupita, al tiempo que se robusteci\u00f3 el sistema el\u00e9ctrico de las l\u00edneas 1 y 2 de las torres de transmisi\u00f3n, ambas asociadas a la subestaci\u00f3n Tucupita.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de CORPOELEC, avanza en el cumplimiento del Plan de Mantenimiento en los Corredores de Servicios, con el prop\u00f3sito de proteger la operatividad de los equipos y las condiciones generales de las infraestructuras el\u00e9ctricas, garantizando un servicio eficiente y de calidad que contribuya al desarrollo integral de la poblaci\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Delta Amacuro.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de mantenimiento preventivo y correctivo en los corredores de servicios<\/p>\n","protected":false},"author":24,"featured_media":103730,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[3458,2761,2704,3064],"class_list":["post-103729","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-barrancas","tag-delta-amacuro","tag-mantenimiento","tag-tucupita"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103729","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103729"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103729\/revisions"}],"predecessor-version":[{"id":103731,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103729\/revisions\/103731"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/103730"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103729"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103729"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}