{"id":103740,"date":"2026-01-21T17:17:24","date_gmt":"2026-01-21T17:17:24","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=103740"},"modified":"2026-01-21T17:17:47","modified_gmt":"2026-01-21T17:17:47","slug":"mantenimiento-integral-optimiza-suministro-electrico-en-valles-del-tuy","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=103740","title":{"rendered":"Mantenimiento integral optimiza suministro el\u00e9ctrico en Valles del Tuy"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Durante el a\u00f1o 2025, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de mantenimiento integral en seis subestaciones de distribuci\u00f3n de los Valles del Tuy, con el objetivo de garantizar un servicio el\u00e9ctrico confiable para la poblaci\u00f3n mirandina.<\/p>\n\n\n\n<p>Los trabajos correctivos incluyeron la sustituci\u00f3n de 122 componentes el\u00e9ctricos, acciones que aseguran la operatividad de las subestaciones Santa Teresa I y Para\u00edso en el municipio Independencia, La Raiza en Paz Castillo, Taz\u00f3n en Sim\u00f3n Bol\u00edvar, Ocumare I en Tom\u00e1s Lander y C\u00faa en Urdaneta.<\/p>\n\n\n\n<p>Asimismo, las cuadrillas especializadas colocaron m\u00e1s de 2.500 metros de conductor en las instalaciones, con el prop\u00f3sito de reforzar las protecciones de los equipos de potencia y brindar un servicio confiable a los usuarios de cinco municipios de la zona tuyera.<\/p>\n\n\n\n<p>Estas maniobras forman parte del Plan de Mantenimiento de Subestaciones y Circuitos El\u00e9ctricos, dise\u00f1ado para mejorar el proceso de distribuci\u00f3n de energ\u00eda en el estado Miranda y consolidar la eficiencia del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Durante el a\u00f1o 2025, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de mantenimiento integral en seis subestaciones de<\/p>\n","protected":false},"author":24,"featured_media":103741,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2709,2905],"class_list":["post-103740","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-miranda","tag-valles-del-tuy"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103740"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103740\/revisions"}],"predecessor-version":[{"id":103746,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103740\/revisions\/103746"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/103741"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}