{"id":103838,"date":"2026-01-26T14:34:34","date_gmt":"2026-01-26T14:34:34","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=103838"},"modified":"2026-01-26T14:34:58","modified_gmt":"2026-01-26T14:34:58","slug":"adecuaciones-optimizan-red-de-distribucion-en-el-eje-tuy-del-estado-miranda","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=103838","title":{"rendered":"Adecuaciones optimizan red de distribuci\u00f3n en el Eje Tuy del estado Miranda"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>Con el prop\u00f3sito de fortalecer el sistema de distribuci\u00f3n de energ\u00eda el\u00e9ctrica para m\u00e1s de 15 mil usuarios en el estado Miranda, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 mejoras operativas en el Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p>\u00a0Las maniobras t\u00e9cnicas se centraron en la sustituci\u00f3n de componentes el\u00e9ctricos, garantizando la estabilidad y confiabilidad del servicio en los sectores Manguito I, II, III, IV, V, VI y zonas adyacentes del municipio Paz Castillo.<\/p>\n\n\n\n<p>Asimismo, restablecieron 30 puntos de alumbrado p\u00fablico con luminarias de tecnolog\u00eda LED, beneficiando directamente a los habitantes de los sectores Tomuso y El Alto, situados en los\u00a0municipios Independencia y Paz Castillo.<\/p>\n\n\n\n<p>Estas acciones est\u00e1n orientadas a mejorar la calidad del servicio y brindar una respuesta oportuna a las necesidades de los usuarios mediante la articulaci\u00f3n con las comunidades organizadas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Con el prop\u00f3sito de fortalecer el sistema de distribuci\u00f3n de energ\u00eda el\u00e9ctrica para m\u00e1s de 15 mil usuarios<\/p>\n","protected":false},"author":24,"featured_media":103839,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2777,2709,2744],"class_list":["post-103838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-distribucion","tag-miranda","tag-sen"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103838"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103838\/revisions"}],"predecessor-version":[{"id":103840,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103838\/revisions\/103840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/103839"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}