{"id":103924,"date":"2026-01-28T17:07:46","date_gmt":"2026-01-28T17:07:46","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=103924"},"modified":"2026-01-28T17:08:08","modified_gmt":"2026-01-28T17:08:08","slug":"fortalecen-transmision-de-energia-para-mas-de-57-mil-familias-mirandinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=103924","title":{"rendered":"Fortalecen transmisi\u00f3n de energ\u00eda para m\u00e1s de 57 mil familias mirandinas"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> En aras de potenciar la transmisi\u00f3n de energ\u00eda, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) abord\u00f3 las subestaciones Santa Teresa III y Santa Luc\u00eda, beneficiando a 57.880 familias del estado Miranda.<\/p>\n\n\n\n<p>Estas acciones, enmarcadas en el Plan de Estabilizaci\u00f3n y Fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN), contemplaron mantenimiento y pruebas el\u00e9ctricas a seccionadores de barra, l\u00ednea y transferencia en los municipios Paz Castillo e Independencia.<\/p>\n\n\n\n<p>Asimismo, el personal especializado realiz\u00f3 la sustituci\u00f3n de componentes el\u00e9ctricos, la verificaci\u00f3n de hermeticidad de cerraduras, as\u00ed como la limpieza y reajuste en borneras.<\/p>\n\n\n\n<p>Adicionalmente, las cuadrillas de Programaci\u00f3n y Control de Vegetaci\u00f3n efectuaron trabajos de desmalezamiento en la subestaci\u00f3n Santa Teresa III, contribuyendo a minimizar los riesgos y fortaleciendo la estabilidad del Sistema El\u00e9ctrico.<\/p>\n\n\n\n<p>En correspondencia con las instrucciones del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, y la presidenta (E) Delcy Rodr\u00edguez, CORPOELEC intensifica los esfuerzos destinados a garantizar la confiabilidad, continuidad y estabilidad del servicio el\u00e9ctrico.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- En aras de potenciar la transmisi\u00f3n de energ\u00eda, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) abord\u00f3 las subestaciones Santa Teresa<\/p>\n","protected":false},"author":24,"featured_media":103925,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,3437,2798],"class_list":["post-103924","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-santa-teresa-iii","tag-transmision"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103924"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103924\/revisions"}],"predecessor-version":[{"id":103926,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103924\/revisions\/103926"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/103925"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}