{"id":103935,"date":"2026-01-28T20:17:05","date_gmt":"2026-01-28T20:17:05","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=103935"},"modified":"2026-01-28T20:17:27","modified_gmt":"2026-01-28T20:17:27","slug":"cuadrillas-de-corpoelec-optimizan-suministro-electrico-para-mas-de-60-mil-barineses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=103935","title":{"rendered":"Cuadrillas de CORPOELEC optimizan suministro el\u00e9ctrico para m\u00e1s de 60 mil barineses"},"content":{"rendered":"\n<p><strong>Estado Barinas.-\u00a0<\/strong>\u00a0La Corporaci\u00f3n El\u00e9ctrica Nacional\u00a0(CORPOELEC) ejecut\u00f3 trabajos correctivos en las redes de distribuci\u00f3n del estado Barinas,\u00a0con el fin de optimizar el suministro de energ\u00eda brindado a m\u00e1s de 60 mil usuarios de los municipios Barinas, Bol\u00edvar, Ezequiel Zamora y Pedraza.<\/p>\n\n\n\n<p>La jornada integral contempl\u00f3 la reposici\u00f3n de l\u00edneas, ajustes, reemplazo de componentes y control de vegetaci\u00f3n en los circuitos Lucha Paiva, Ra\u00fal Leoni, Hormiga, Barinesa, Mijagua, Pagueycito, Parangula y Curbati.<\/p>\n\n\n\n<p>El impacto positivo de estas labores abarca comunidiades de las parroquias Santa B\u00e1rbara, Ram\u00f3n Ignacio M\u00e9ndez, Barinitas, Jos\u00e9 F\u00e9lix Ribas, Ciudad Bolivia y Alfredo Arvelo Larriva.<\/p>\n\n\n\n<p>A trav\u00e9s de estas maniobras, el personal especializado brind\u00f3 atenci\u00f3n directa a los requerimientos de usuarios residenciales, comerciales y sectores productivos de estas localidades, garantizando un sistema m\u00e1s robusto para el desarrollo de las actividades diarias.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.-\u00a0\u00a0La Corporaci\u00f3n El\u00e9ctrica Nacional\u00a0(CORPOELEC) ejecut\u00f3 trabajos correctivos en las redes de distribuci\u00f3n del estado Barinas,\u00a0con el fin de optimizar<\/p>\n","protected":false},"author":24,"featured_media":103936,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2698,2691],"class_list":["post-103935","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-barinas","tag-corpoelec"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103935"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103935\/revisions"}],"predecessor-version":[{"id":103937,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/103935\/revisions\/103937"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/103936"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}