{"id":104016,"date":"2026-01-31T13:16:27","date_gmt":"2026-01-31T13:16:27","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=104016"},"modified":"2026-01-31T13:16:43","modified_gmt":"2026-01-31T13:16:43","slug":"adecuaciones-a-circuitos-de-distribucion-optimiza-suministro-electrico-para-mas-de-39-mil-barineses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=104016","title":{"rendered":"Adecuaciones a circuitos de distribuci\u00f3n optimiza suministro el\u00e9ctrico para m\u00e1s de 39 mil barineses"},"content":{"rendered":"\n<p><strong>Estado Barinas.-<\/strong>\u00a0 La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de adecuaci\u00f3n y mantenimiento integral en 10 circuitos de distribuci\u00f3n, con el objetivo de elevar la calidad del suministro el\u00e9ctrico brindado a aproximadamente 39.800 habitantes del estado Barinas.<\/p>\n\n\n\n<p>Los trabajos preventivos y correctivos contemplaron maniobras t\u00e9cnicas especializadas, entre las que destacan: activaci\u00f3n de puntos de seccionamiento, instalaci\u00f3n de nuevos componentes, mejoras de conexiones, traslados de l\u00edneas en media tensi\u00f3n y limpieza de los corredores de servicio.<\/p>\n\n\n\n<p>El trabajo progresivo de las cuadrillas de CORPOELEC optimiz\u00f3 significativamente el rendimiento de los\u00a0 circuitos Barrancas, Agroisle\u00f1a, Barinitas, Santa B\u00e1rbara I y II, Canagu\u00e1, Anaro, Ciudad Bolivia, Curbat\u00ed y Chameta, en los municipios Barinas, Ezequiel Zamora, Bol\u00edvar, Cruz Paredes, Pedraza y Alberto Arvelo Torrealba, consolidando una red m\u00e1s robusta y eficiente.<\/p>\n\n\n\n<p>El Gobierno Nacional, junto a la fuerza trabajadora del sector el\u00e9ctrico, se mantiene desplegado de manera permanente con el prop\u00f3sito de garantizar un servicio confiable y estable para la poblaci\u00f3n venezolana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.-\u00a0 La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de adecuaci\u00f3n y mantenimiento integral en 10 circuitos de distribuci\u00f3n, con<\/p>\n","protected":false},"author":24,"featured_media":104017,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[3578,2698,2824,2691,2777,2704],"class_list":["post-104016","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-adecuaciones","tag-barinas","tag-circuitos","tag-corpoelec","tag-distribucion","tag-mantenimiento"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=104016"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104016\/revisions"}],"predecessor-version":[{"id":104018,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104016\/revisions\/104018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/104017"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=104016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=104016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=104016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}