{"id":104172,"date":"2026-02-05T16:18:19","date_gmt":"2026-02-05T16:18:19","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=104172"},"modified":"2026-02-05T16:18:46","modified_gmt":"2026-02-05T16:18:46","slug":"favorecen-a-mas-37-mil-familias-con-mantenimiento-preventivo-en-la-subestacion-carupano","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=104172","title":{"rendered":"Favorecen a m\u00e1s 37 mil familias con mantenimiento preventivo en la subestaci\u00f3n Car\u00fapano"},"content":{"rendered":"\n<p><strong>Estado Sucre.-<\/strong> Cumpliendo con el plan de robustecimiento del Sistema El\u00e9ctrico Nacional (SEN), la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), ejecut\u00f3 una jornada de mantenimiento correctivo y preventivo en la subestaci\u00f3n Car\u00fapano situada en el municipio Berm\u00fadez del estado Sucre, para beneficiar a m\u00e1s de 37 mil familias.<\/p>\n\n\n\n<p>Las maniobras realizadas en el Transformador N\u00b0 4, permitieron corregir los puntos calientes detectados en el tramo de potencia garantizando la continuidad del suministro de energ\u00eda en los municipios Berm\u00fadez, Arismendi y Ben\u00edtez.<\/p>\n\n\n\n<p>Durante la intervenci\u00f3n, se realizaron labores minuciosas que incluyeron el ajuste y limpieza de componentes de alta tensi\u00f3n, sustituci\u00f3n de torniller\u00eda para optimizar el contacto el\u00e9ctrico e inspecci\u00f3n especializada en los equipos de maniobra.<\/p>\n\n\n\n<p>Estas labores aseguran la operatividad de los circuitos La Planta, ubicada en el municipio Berm\u00fadez, R\u00edo Caribe en el municipio Arismendi y Aj\u00edes del municipio Ben\u00edtez, respectivamente.<\/p>\n\n\n\n<p>Con estas acciones, el Ministerio del Poder popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de CORPOELEC, contin\u00faan beneficiando al Poder Popular, brindando un servicio eficiente y confiable a las comunidades del eje pariano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Sucre.- Cumpliendo con el plan de robustecimiento del Sistema El\u00e9ctrico Nacional (SEN), la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), ejecut\u00f3 una<\/p>\n","protected":false},"author":24,"featured_media":104173,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,11,2744,2693],"class_list":["post-104172","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-sen","tag-sucre"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=104172"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104172\/revisions"}],"predecessor-version":[{"id":104174,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104172\/revisions\/104174"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/104173"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=104172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=104172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=104172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}