{"id":104247,"date":"2026-02-07T14:24:17","date_gmt":"2026-02-07T14:24:17","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=104247"},"modified":"2026-02-07T14:24:36","modified_gmt":"2026-02-07T14:24:36","slug":"mantenimiento-integral-en-subestaciones-electricas-favorecio-a-mas-de-115-mil-usuarios-mirandinos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=104247","title":{"rendered":"Mantenimiento integral en subestaciones el\u00e9ctricas favoreci\u00f3 a m\u00e1s de 115 mil usuarios mirandinos"},"content":{"rendered":"\n<p><strong>Estado Miranda.-\u00a0<\/strong>El equipo t\u00e9cnico especializado de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 maniobras correctivas y preventivas en Subestaciones de Distribuci\u00f3n mirandinas, con el fin de beneficiar a m\u00e1s de 115 mil usuarios de los Valles del Tuy y Barlovento.<\/p>\n\n\n\n<p>Los trabajos ejecutados en las subestaciones Santa Teresa I, La Raiza, Carenero e Higuerote, se centraron en el cambio de interruptores y reconectadores que mejoran el funcionamiento de 16 circuitos de distribuci\u00f3n de energ\u00eda el\u00e9ctrica.<\/p>\n\n\n\n<p>Las maniobras responden al Plan de Mantenimiento de Subestaciones y Circuitos El\u00e9ctricos para garantizar un servicio de calidad a los habitantes de los municipios Paz Castillo, Independencia y Bri\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.-\u00a0El equipo t\u00e9cnico especializado de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 maniobras correctivas y preventivas en Subestaciones de Distribuci\u00f3n<\/p>\n","protected":false},"author":22,"featured_media":104250,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,11,2744,46],"class_list":["post-104247","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=104247"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104247\/revisions"}],"predecessor-version":[{"id":104251,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104247\/revisions\/104251"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/104250"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=104247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=104247"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=104247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}