{"id":104447,"date":"2026-02-18T16:05:57","date_gmt":"2026-02-18T16:05:57","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=104447"},"modified":"2026-02-18T16:06:46","modified_gmt":"2026-02-18T16:06:46","slug":"mantenimiento-preventivo-en-subestaciones-favorece-a-mas-de-120-mil-barineses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=104447","title":{"rendered":"Mantenimiento preventivo en subestaciones favorece a m\u00e1s de 120 mil barineses"},"content":{"rendered":"\n<p><strong>Estado Barinas-\u00a0<\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) benefici\u00f3 m\u00e1s de 120 mil habitantes mediante labores de mantenimiento preventivo realizadas en subestaciones con niveles de tensi\u00f3n de 115 kV, con el objetivo de garantizar la estabilidad del flujo energ\u00e9tico en los municipios\u00a0Barinas, Ezequiel Zamora y Pedraza del estado Barinas.<\/p>\n\n\n\n<p>Estas acciones, ejecutadas de manera progresiva por el personal t\u00e9cnico en las instalaciones\u00a0Barinas\u00a0I, II y III, Tore\u00f1o, Socop\u00f3 y Pe\u00f1a Larga, incluyeron la adecuaci\u00f3n de equipos, limpieza, pruebas funcionales, revisiones, ajustes generales y correcci\u00f3n de puntos calientes.\u00a0\u00a0<\/p>\n\n\n\n<p>Las maniobras, esenciales para garantizar el \u00f3ptimo funcionamiento de las infraestructuras el\u00e9ctricas y prolongar la vida \u00fatil de los equipos de potencia asociados a los circuitos Carolina, Quebrada Seca, Alto\u00a0Barinas\u00a0I, Canagua, Capitanejo, Pagueycito, Barrancas, Los Pinos e Industrial, favorecen tanto a zonas residenciales como a los sectores productivos de la regi\u00f3n.<\/p>\n\n\n\n<p>Con estas jornadas preventivas, CORPOELEC ratifica su compromiso de blindar el Sistema El\u00e9ctrico Nacional (SEN) a trav\u00e9s de mejoras t\u00e9cnicas que representan un respaldo directo al bienestar de las familias barinesas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas-\u00a0La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) benefici\u00f3 m\u00e1s de 120 mil habitantes mediante labores de mantenimiento preventivo realizadas en subestaciones<\/p>\n","protected":false},"author":24,"featured_media":104448,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2698,2691,3150,3597],"class_list":["post-104447","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-barinas","tag-corpoelec","tag-ezequiel-zamora","tag-pedraza"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104447","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=104447"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104447\/revisions"}],"predecessor-version":[{"id":104449,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104447\/revisions\/104449"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/104448"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=104447"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=104447"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=104447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}