{"id":104453,"date":"2026-02-18T16:54:50","date_gmt":"2026-02-18T16:54:50","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=104453"},"modified":"2026-02-18T16:55:37","modified_gmt":"2026-02-18T16:55:37","slug":"corpoelec-atendio-mas-de-2-500-reportes-electricos-en-comunidades-mirandinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=104453","title":{"rendered":"CORPOELEC atendi\u00f3 m\u00e1s de 2.500 reportes el\u00e9ctricos en comunidades mirandinas"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>Durante el mes de enero, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) atendi\u00f3 2.563 casos reportados a trav\u00e9s de la VenApp del Sistema 1&#215;10 del Buen Gobierno en el estado Miranda.<\/p>\n\n\n\n<p>Los equipos operativos instalaron transformadores de diferentes capacidades en comunidades de los ejes Barlovento, Altos Mirandinos, Valles del Tuy, Metropolitano y Guarenas-Guatire, optimizando as\u00ed el sistema de distribuci\u00f3n en la entidad central.<\/p>\n\n\n\n<p>De igual forma, se ubicaron nuevas luminarias LED para fortalecer el funcionamiento del alumbrado p\u00fablico en calles, avenidas y autopistas mirandinas.<\/p>\n\n\n\n<p>Las respuestas positivas tambi\u00e9n se reflejaron en labores de mantenimiento preventivo y correctivo en circuitos el\u00e9ctricos, as\u00ed como en el control de la vegetaci\u00f3n que interfer\u00eda con los corredores de l\u00edneas de baja y media tensi\u00f3n.<\/p>\n\n\n\n<p>El abordaje t\u00e9cnico garantiza la atenci\u00f3n oportuna a las solicitudes ciudadanas y refuerza la infraestructura el\u00e9ctrica de Miranda, garantizando un servicio de mayor eficiencia, calidad y estabilidad.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Durante el mes de enero, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) atendi\u00f3 2.563 casos reportados a trav\u00e9s de la<\/p>\n","protected":false},"author":24,"featured_media":104454,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2688,2691,2709,2868],"class_list":["post-104453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-1x10-del-buen-gobierno","tag-corpoelec","tag-miranda","tag-venapp"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=104453"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104453\/revisions"}],"predecessor-version":[{"id":104455,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104453\/revisions\/104455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/104454"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=104453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=104453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=104453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}