{"id":104498,"date":"2026-02-19T18:30:47","date_gmt":"2026-02-19T18:30:47","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=104498"},"modified":"2026-02-19T18:33:18","modified_gmt":"2026-02-19T18:33:18","slug":"adecuacion-en-la-linea-central-veritas-garantiza-servicio-electrico-a-usuarios-marabinos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=104498","title":{"rendered":"Adecuaci\u00f3n en la l\u00ednea Central-Veritas garantiza servicio el\u00e9ctrico a usuarios marabinos"},"content":{"rendered":"\n<p><strong>\u200eEstado Zulia.- <\/strong>En aras de garantizar la continuidad del servicio y optimizar la infraestructura el\u00e9ctrica en el estado Zulia, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 un despliegue operativo, para la adecuaci\u00f3n t\u00e9cnica de la l\u00ednea Central-Veritas-2 a 24 kV.<\/p>\n\n\n\n<p>\u200e\u200eLas maniobras comprendieron el reemplazo preventivo de componentes, a fin de asegurar el funcionamiento correcto de la l\u00ednea. \u200eAsimismo, se efectuaron trabajos de control de vegetaci\u00f3n en corredores el\u00e9ctricos y a lo largo de toda la trayectoria de la l\u00ednea. Esta intervenci\u00f3n forestal previene el contacto de la vegetaci\u00f3n con el cableado.<\/p>\n\n\n\n<p>\u200eEl abordaje incluy\u00f3 la modernizaci\u00f3n de los sistemas de protecci\u00f3n contra sobretensiones, mediante el reemplazo de pararrayos en los extremos de las subestaciones Central y Veritas.<\/p>\n\n\n\n<p>De igual manera, se realiz\u00f3 la instalaci\u00f3n de copas terminales en los puntos de entrada y salida, reforzando las conexiones de potencia entre ambas infraestructuras.<\/p>\n\n\n\n<p>\u200e\u200eEstas labores permiten fortalecer la confiabilidad operativa de la subestaci\u00f3n Veritas, instalaci\u00f3n que suministra energ\u00eda a los sectores comerciales, institucionales y residenciales del Casco Central del municipio Maracaibo.<\/p>\n\n\n\n<p><strong>\u200ePrensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u200eEstado Zulia.- En aras de garantizar la continuidad del servicio y optimizar la infraestructura el\u00e9ctrica en el estado Zulia, la<\/p>\n","protected":false},"author":24,"featured_media":104509,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,11,2694],"class_list":["post-104498","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=104498"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104498\/revisions"}],"predecessor-version":[{"id":104511,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104498\/revisions\/104511"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/104509"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=104498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=104498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=104498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}