{"id":104676,"date":"2026-02-25T17:42:46","date_gmt":"2026-02-25T17:42:46","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=104676"},"modified":"2026-02-25T17:43:27","modified_gmt":"2026-02-25T17:43:27","slug":"avanzan-maniobras-preventivas-para-fortalecer-subestacion-guayana-a","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=104676","title":{"rendered":"Avanzan maniobras preventivas para fortalecer subestaci\u00f3n Guayana A"},"content":{"rendered":"\n<p><strong>Estado Bol\u00edvar.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) culmin\u00f3 la segunda fase de abordaje preventivo en la subestaci\u00f3n Guayana \u00abA\u00bb, ubicada en el estado Bol\u00edvar.<\/p>\n\n\n\n<p>Durante la jornada, el personal t\u00e9cnico especializado ejecut\u00f3 labores de mantenimiento integral a la fase \u00ab0\u00bb del autotransformador n\u00famero 2 de 230\/115\/13.8 kV.<\/p>\n\n\n\n<p>Las maniobras incluyeron rigurosas pruebas electromec\u00e1nicas, verificaci\u00f3n de conexiones de alta y baja tensi\u00f3n, as\u00ed como mediciones especializadas de corriente de excitaci\u00f3n, capacitancia y resistencia de devanados.<\/p>\n\n\n\n<p>Estas acciones estrat\u00e9gicas tienen como objetivo primordial blindar la operatividad de los equipos de potencia que integran el Sistema Regional \u00abA\u00bb, cuya robustez depende directamente de las fuentes de generaci\u00f3n hidroel\u00e9ctrica de Guri y Macagua.<\/p>\n\n\n\n<p>La subestaci\u00f3n Guayana \u00abA\u00bb garantiza la estabilidad del flujo el\u00e9ctrico, su correcto funcionamiento es vital para el transporte de energ\u00eda en Ciudad Bol\u00edvar y El Tigre, en el estado Anzo\u00e1tegui, mediante el sistema interconectado de 230 kV.<\/p>\n\n\n\n<p>Con estas labores, CORPOELEC ratifica su compromiso con la optimizaci\u00f3n del Sistema El\u00e9ctrico Nacional (SEN), ejecutando planes de mantenimiento correctivo y preventivo que permitan ofrecer un servicio eficiente, confiable y de calidad para el bienestar de todo el pueblo venezolano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Bol\u00edvar.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) culmin\u00f3 la segunda fase de abordaje preventivo en la subestaci\u00f3n Guayana \u00abA\u00bb, ubicada<\/p>\n","protected":false},"author":24,"featured_media":104678,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2723,3610],"class_list":["post-104676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-bolivar","tag-guayana-a"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=104676"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104676\/revisions"}],"predecessor-version":[{"id":104679,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/104676\/revisions\/104679"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/104678"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=104676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=104676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=104676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}