{"id":105064,"date":"2026-03-10T16:05:30","date_gmt":"2026-03-10T16:05:30","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=105064"},"modified":"2026-03-10T16:05:59","modified_gmt":"2026-03-10T16:05:59","slug":"plan-control-de-vegetacion-atiende-circuitos-electricos-mirandinos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=105064","title":{"rendered":"Plan Control de Vegetaci\u00f3n atiende circuitos el\u00e9ctricos mirandinos"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>Cuadrillas operativas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) despejaron la vegetaci\u00f3n cercana al tendido el\u00e9ctrico en 24 circuitos de distribuci\u00f3n del estado Miranda, atendiendo a 450 kil\u00f3metros de corredores de l\u00edneas en baja, media y alta tensi\u00f3n.<\/p>\n\n\n\n<p>Las labores preventivas obedecen a la aplicaci\u00f3n del Plan de Control de Vegetaci\u00f3n, el cual permite optimizar la prestaci\u00f3n de servicio a usuarios residenciales, comerciales e industriales en 9 municipios del eje mirandino.<\/p>\n\n\n\n<p>Estas labores consisten en el despeje de la maleza y vegetaci\u00f3n cercana al tendido el\u00e9ctrico y a componentes, equipos, subestaciones e instalaciones del sistema el\u00e9ctrico en la regi\u00f3n.<\/p>\n\n\n\n<p>La programaci\u00f3n y desarrollo de mantenimientos continuos efectuados por la estatal el\u00e9ctrica, contribuye a la estabilizaci\u00f3n del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Cuadrillas operativas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) despejaron la vegetaci\u00f3n cercana al tendido el\u00e9ctrico en 24 circuitos<\/p>\n","protected":false},"author":24,"featured_media":105071,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2709,11],"class_list":["post-105064","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-miranda","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=105064"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105064\/revisions"}],"predecessor-version":[{"id":105072,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105064\/revisions\/105072"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/105071"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=105064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=105064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=105064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}