{"id":105269,"date":"2026-03-16T13:16:28","date_gmt":"2026-03-16T13:16:28","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=105269"},"modified":"2026-03-16T13:17:05","modified_gmt":"2026-03-16T13:17:05","slug":"realizan-adecuaciones-en-sistema-electrico-de-los-municipios-guanare-y-araure","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=105269","title":{"rendered":"Realizan adecuaciones en sistema el\u00e9ctrico de los municipios Guanare y Araure"},"content":{"rendered":"\n<p><strong>Estado Portuguesa.-<\/strong> La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), efectu\u00f3 adecuaciones en la salida de los circuitos Cementerio y Zona Industrial 13.8kV, a fin de fortalecer la distribuci\u00f3n del servicio brindado a m\u00e1s de 21 mil usuarios de los municipios Guanare y Araure del estado Portuguesa.<\/p>\n\n\n\n<p>Las labores que se materializaron en las instalaciones de las subestaciones Las Flores y Acarigua I, contemplaron la energizaci\u00f3n de un interruptor, correcci\u00f3n de puntos calientes, ajustes de conexiones, mediciones t\u00e9cnicas y limpieza general.<\/p>\n\n\n\n<p>Con estas maniobras se optimiza la operatividad de las redes de distribuci\u00f3n y se extiende la vida \u00fatil de los equipos el\u00e9ctricos, brindando mayor confiabilidad al sistema el\u00e9ctrico en la regi\u00f3n llanera.<\/p>\n\n\n\n<p>Asimismo, el personal especializado de la Corporaci\u00f3n llev\u00f3 a cabo el mantenimiento al banco de bater\u00edas asociados a la subestaci\u00f3n Acarigua II\/230kV, actividad establecida en el Plan de Mantenimiento.<\/p>\n\n\n\n<p>CORPOELEC avanza en el fortalecimiento del servicio el\u00e9ctrico, para asegurar la calidad de vida de los usuarios portuguese\u00f1os.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Portuguesa.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), efectu\u00f3 adecuaciones en la salida de los circuitos Cementerio<\/p>\n","protected":false},"author":24,"featured_media":105273,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,11,2725],"class_list":["post-105269","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-portuguesa"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=105269"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105269\/revisions"}],"predecessor-version":[{"id":105274,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105269\/revisions\/105274"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/105273"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=105269"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=105269"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=105269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}