{"id":105396,"date":"2026-03-20T15:13:00","date_gmt":"2026-03-20T15:13:00","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=105396"},"modified":"2026-03-20T15:13:34","modified_gmt":"2026-03-20T15:13:34","slug":"avanza-plan-de-control-de-vegetacion-en-subestaciones-sucrenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=105396","title":{"rendered":"Avanza Plan de Control de Vegetaci\u00f3n en subestaciones sucrenses"},"content":{"rendered":"\n<p><strong>Estado Sucre.-<\/strong> Como parte de las acciones preventivas para garantizar la operatividad en el Sistema El\u00e9ctrico Nacional (SEN), la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), ejecut\u00f3 una jornada de mantenimiento en el estado Sucre, en beneficio de m\u00e1s de 800 mil familias de la entidad.<\/p>\n\n\n\n<p>Las cuadrillas especializadas efectuaron las labores en las subestaciones Cuman\u00e1 II (115kV), Yaguaraparo y Sucre, atendiendo sectores estrat\u00e9gicos en los municipios Sucre, Cajigal, Arismendi y Valdez. El despliegue t\u00e9cnico permiti\u00f3 optimizar la infraestructura y reducir vulnerabilidades ante posibles contingencias.<\/p>\n\n\n\n<p>Las jornadas incluyeron el desmalezamiento de patios de potencia, limpieza de fachadas, adecuaci\u00f3n de caminer\u00edas y la revisi\u00f3n de cercas perim\u00e9tricas.<\/p>\n\n\n\n<p>De igual manera, se efectu\u00f3 el mantenimiento de cortafuegos para proteger los equipos de alta tensi\u00f3n ante incendios forestales y asegurar el libre acceso de los operarios en las maniobras de control.<\/p>\n\n\n\n<p>A trav\u00e9s de estas acciones preventivas, el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de CORPOELEC, consolida el mantenimiento integral, fortaleciendo la red el\u00e9ctrica en el oriente del pa\u00eds y asegurando la continuidad operativa de las subestaciones.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Sucre.- Como parte de las acciones preventivas para garantizar la operatividad en el Sistema El\u00e9ctrico Nacional (SEN), la Corporaci\u00f3n<\/p>\n","protected":false},"author":24,"featured_media":105401,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,3436,2693],"class_list":["post-105396","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-plan-de-control-de-vegetacion","tag-sucre"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=105396"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105396\/revisions"}],"predecessor-version":[{"id":105403,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105396\/revisions\/105403"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/105401"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=105396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=105396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=105396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}