{"id":105453,"date":"2026-03-23T15:39:34","date_gmt":"2026-03-23T15:39:34","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=105453"},"modified":"2026-03-23T15:40:06","modified_gmt":"2026-03-23T15:40:06","slug":"mas-de-51-mil-mirandinos-favorecidos-con-mantenimiento-preventivo","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=105453","title":{"rendered":"M\u00e1s de 51 mil mirandinos favorecidos con mantenimiento preventivo"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>Con el objetivo de fortalecer la confiabilidad del servicio el\u00e9ctrico, trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), efectuaron una inspecci\u00f3n termogr\u00e1fica a los equipos de potencia a 115\/34,5\/13.8 Kv, con el objetivo de optimizar el funcionamiento de la infraestructura Charallave II.<\/p>\n\n\n\n<p>Las labores consistieron en detectar variaciones de temperaturas y puntos calientes en sistemas el\u00e9ctricos, a trav\u00e9s de la inspecci\u00f3n termogr\u00e1fica mejorando la seguridad y eficiencia energ\u00e9tica para la distribuci\u00f3n del servicio a 51 mil 731 usuarios del municipio Urdaneta.<\/p>\n\n\n\n<p>El personal t\u00e9cnico verific\u00f3 el funcionamiento de conectores e interruptores, con la finalidad de corregir anomal\u00edas y garantizar la transmisi\u00f3n eficiente del servicio, para asegurar la operatividad de los circuitos C\u00faa I y II.<\/p>\n\n\n\n<p>CORPOELEC garantiza el cumplimiento de los planes de mantenimiento al Sistema El\u00e9ctrico Nacional (SEN), instruido por el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), en aras de fortalecer el suministro de energ\u00eda a las comunidades del eje Valles del Tuy.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Con el objetivo de fortalecer la confiabilidad del servicio el\u00e9ctrico, trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), efectuaron<\/p>\n","protected":false},"author":24,"featured_media":105458,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2709,11],"class_list":["post-105453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-miranda","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=105453"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105453\/revisions"}],"predecessor-version":[{"id":105459,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105453\/revisions\/105459"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/105458"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=105453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=105453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=105453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}