{"id":105620,"date":"2026-04-07T14:39:35","date_gmt":"2026-04-07T14:39:35","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=105620"},"modified":"2026-04-07T14:40:39","modified_gmt":"2026-04-07T14:40:39","slug":"corpoelec-atendio-mas-de-3-mil-casos-reportados-por-la-venapp-en-miranda","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=105620","title":{"rendered":"CORPOELEC atendi\u00f3 m\u00e1s de 3 mil casos reportados por la VenApp en Miranda"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Durante el mes de marzo, los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) atendieron 3.059 reportes recibidos a trav\u00e9s de la plataforma VenApp del Sistema 1&#215;10 del Buen Gobierno en el estado Miranda.<\/p>\n\n\n\n<p>Los equipos operativos solventaron aver\u00edas registradas en l\u00edneas de media y baja tensi\u00f3n e instalaron transformadores en comunidades de los ejes Barlovento, Altos Mirandinos, Eje Metropolitano, Valles del Tuy y Guarenas-Guatire.<\/p>\n\n\n\n<p>De igual forma, se dio respuesta a los usuarios con la reparaci\u00f3n y sustituci\u00f3n de luminarias con tecnolog\u00eda LED para optimizar el sistema de alumbrado p\u00fablico.<\/p>\n\n\n\n<p>El <a href=\"https:\/\/mppee.gob.ve\/?p=99708\" data-type=\"link\" data-id=\"https:\/\/mppee.gob.ve\/?p=99708\">Plan Nacional de Control de Vegetaci\u00f3n<\/a> tambi\u00e9n fue desplegado en la entidad central, con la finalidad de despejar la vegetaci\u00f3n cercana al tendido el\u00e9ctrico y garantizar la efectividad en la distribuci\u00f3n de energ\u00eda.<\/p>\n\n\n\n<p>CORPOELEC mantiene sus cuadrillas activas para ofrecer a los mirandinos un servicio eficiente y de calidad.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Durante el mes de marzo, los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) atendieron 3.059 reportes recibidos a<\/p>\n","protected":false},"author":24,"featured_media":105617,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,2868],"class_list":["post-105620","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-venapp"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105620","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=105620"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105620\/revisions"}],"predecessor-version":[{"id":105626,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105620\/revisions\/105626"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/105617"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=105620"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=105620"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=105620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}