{"id":105649,"date":"2026-04-08T14:47:44","date_gmt":"2026-04-08T14:47:44","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=105649"},"modified":"2026-04-08T14:48:16","modified_gmt":"2026-04-08T14:48:16","slug":"plan-de-control-de-vegetacion-fortalece-redes-electricas-en-aragua","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=105649","title":{"rendered":"Plan de Control de Vegetaci\u00f3n fortalece redes el\u00e9ctricas en Aragua"},"content":{"rendered":"\n<p><strong>Estado Aragua.-<\/strong>\u00a0Desde este mi\u00e9rcoles 08 hasta el pr\u00f3ximo martes 14 de abril, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), se despliega por el estado Aragua para efectuar labores a trav\u00e9s del Plan de Control de Vegetaci\u00f3n, en aras de optimizar las redes el\u00e9ctricas.<\/p>\n\n\n\n<p>Los trabajos preventivos se ejecutar\u00e1n en los municipios Girardot, Mario Brice\u00f1o Iragorry, Santiago Mari\u00f1o, Jos\u00e9 F\u00e9lix Ribas, Zamora y Sucre.<\/p>\n\n\n\n<p>Las jornadas se desarrollar\u00e1n en un horario comprendido desde las 12:00 del mediod\u00eda hasta las 4:00 de la tarde en los circuitos Telefunke D1705, Ca\u00f1a de Az\u00facar, Turmero, Zuata, Zamora, Av. Sucre, Ienca, Produvisa y Bello Monte, respectivamente.<\/p>\n\n\n\n<p>CORPOELEC contin\u00faa avanzando en el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN) y la mejora continua para los usuarios de las poblaciones arag\u00fce\u00f1as, como parte del Plan de Control y Vegetaci\u00f3n, impulsado por el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Aragua.-\u00a0Desde este mi\u00e9rcoles 08 hasta el pr\u00f3ximo martes 14 de abril, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional<\/p>\n","protected":false},"author":24,"featured_media":105651,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2708,2691,11,3436],"class_list":["post-105649","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-aragua","tag-corpoelec","tag-mppee","tag-plan-de-control-de-vegetacion"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=105649"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105649\/revisions"}],"predecessor-version":[{"id":105652,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105649\/revisions\/105652"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/105651"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=105649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=105649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=105649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}