{"id":105673,"date":"2026-04-09T15:46:47","date_gmt":"2026-04-09T15:46:47","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=105673"},"modified":"2026-04-09T15:47:55","modified_gmt":"2026-04-09T15:47:55","slug":"corpoelec-beneficio-a-mas-de-480-meridenos-con-mantenimiento-integral","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=105673","title":{"rendered":"CORPOELEC benefici\u00f3 a m\u00e1s de 480 meride\u00f1os con mantenimiento integral"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.- <\/strong>Dando respuesta a las solicitudes de las comunidades, cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realizaron los trabajos de sustituci\u00f3n de equipos estrat\u00e9gicos y reubicaron l\u00edneas de baja tensi\u00f3n en el sector calle Las Monjas, ubicado en el municipio Campo El\u00edas del estado M\u00e9rida, para beneficiar a m\u00e1s de 480 habitantes del estado andino.<\/p>\n\n\n\n<p>Asimismo, se adecuaron redes de telecomunicaciones, labores ejecutadas por los trabajadores de la Red de Conexiones Din\u00e1micas y Ecol\u00f3gicas (EDC Network), ente adscrito al Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE).<\/p>\n\n\n\n<p>Con estas acciones, el Gobierno Bolivariano reafirma su compromiso con la modernizaci\u00f3n de los servicios p\u00fablicos en el estado M\u00e9rida, al tiempo que brinda las condiciones \u00f3ptimas para el suministro operaci\u00f3n, tanto para el sistema el\u00e9ctrico como para las redes de telecomunicaciones en el sector.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.- Dando respuesta a las solicitudes de las comunidades, cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realizaron los trabajos<\/p>\n","protected":false},"author":24,"featured_media":105679,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2742,11],"class_list":["post-105673","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-merida","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=105673"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105673\/revisions"}],"predecessor-version":[{"id":105680,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/105673\/revisions\/105680"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/105679"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=105673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=105673"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=105673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}